My WebLink
|
Help
|
About
|
Sign Out
ORD 1132
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1101 - 1200
>
ORD 1132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 8:42:55 AM
Creation date
3/18/1999 5:24:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35. That in-lieu park dedication fees be collected by the City <br /> at the time of building permit issuance, at the rate then <br /> in e~ffect unless this requirement has been otherwise <br /> satisfied. <br /> <br />36. That the developer submit a refundable cash bond for hazard <br /> control prior to issuance of a building permit. The amount <br /> of this bond will be determined by the City Engineer. <br /> <br />37. T~at prior to issuance of a building permit, the developer <br /> shall pay the applicable Zone 7 and City connection fees <br /> and water meter cost for any water meters (irrigation <br /> meters) not directly related to a building permit. <br /> <br />38. That the developer grant an easement to the City over <br /> those parcels shown as public service easements (P.S.E.) <br /> and which are approved by the City Engineer or other parcels <br /> which may be designated by the City Engineer. <br /> <br />39. 'That vertical P.C.C. curbs and gutters be constructed <br /> wit!~in this development unless otherwise approved by the <br /> Cit~~ E~gineer and that the curb and gutter be poured mono- <br /> !ith[cally with the sidewalk when the sidewalk is adjacent. <br /> <br />40. Th~_ ~he [~a,~] route for all materials to and from this <br /> de~e-].opment be approved by the City Engineer prior to the <br /> start of any construction. <br /> <br />41. That the developer submit an ero~sion and sedimentation control <br /> plan or procedure as part of the improvement plans prior to <br /> the final approval of the development. <br /> <br />42. That the developer submit a dust control plan or procedure as <br /> part of the improvement plans prior to the final approval of <br /> the ;~!evelopment. <br /> <br />43. That storm drainage swales, gutters, inlets. outfalls,.and <br /> channels not within -the area of a dedicated public street <br /> or public service easement approved by the City Engineer be <br /> privately maintained by the property owners or through an <br /> association approved by the City. <br /> <br />44. That approval of the water supply and distribution system be <br /> withheld pendj. ng final design and until the developer has <br /> demoi~strated to ~he satisfaction of the City Engineer that <br /> the ]?roposed system meets both the immediate and long-range <br /> requiFen~ents 8'o~; supplying water in this area. <br /> <br />45. That the developer comply with any and all applicable requirefnents <br /> of the cross-connections control and backflow prevention device <br /> programs required by the California Administrative Code, <br /> Title 17. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.