My WebLink
|
Help
|
About
|
Sign Out
12 ATTACHMENT
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
050410
>
12 ATTACHMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2010 4:25:03 PM
Creation date
4/29/2010 3:42:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/4/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
12 ATTACHMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> Commissioner Pearce stated that on page 6, it is stated that the pool area will be <br /> designed to be ADA accessible, adding that this was also directed by the City Council. <br /> She noted, however, that this was not listed in the conditions. <br /> Chair Olson agreed that it was included in the 36 -unit development description but not <br /> in the conditions. <br /> Mr. Pavan replied that it is not specifically listed in the conditions as this is addressed by <br /> the CBC. He explained that in this type of project, the pool area must meet CBC <br /> requirements for ADA accessibility, although not necessarily the pool itself. He added <br /> that the applicant has indicated that a lift is normally required by the CBC and that it <br /> could be added as a condition. <br /> Referring to the hours of construction, Commissioner Narum suggested that, given the <br /> density of the complex and the amount of grading to be done by louder equipments, no <br /> work be allowed on Saturdays to give neighboring residents a couple of days of quiet. <br /> She added that she has no objection to quieter work such as painting on Saturdays. <br /> Mr. Pavan noted that allowing Saturday construction would decrease the total <br /> construction time for the entire project. <br /> Commissioner Pentin stated that he did not believe it would take long to complete the <br /> grading. <br /> Commissioner Pearce noted that construction is typically done during the weekdays. <br /> Mr. Pavan suggested that noisy construction activity such as demolition, grading, and <br /> framing be limited to Monday through Friday, and interior work to Saturdays. <br /> The Commission agreed and directed staff to revise Condition No. 20 to limit the noisy <br /> activities to Monday through Friday and to allow quieter activities from Monday through <br /> Saturday. <br /> Commissioner Pentin inquired if the Commissioners would support having two <br /> bathrooms on the ground -floor units with one of them having a roll -in shower. <br /> The Commissioners concurred. <br /> Commissioner Narum applauded the applicant for making an effort to adhere to the <br /> conditions; however, she expressed concern that there is no real open space on the <br /> property. She noted that there is usually some grass around pools for people to run <br /> around and indicated that if one of the three -story units were taken out and replaced <br /> with grass, it would provide some open space area. <br /> DRAFT EXCERPTS: PLANNING COMMISSION MINUTES, 3/10/2010 Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.