Laserfiche WebLink
Chapter 17.44 INCLUSIONARY ZONING Page 6 of 8 <br /> the inclusionary units and they are intended to augment the developer's proposal. <br /> D. Priority Processing. After receiving its discretionary approvals, a project that provides inclusionary <br /> units may be entitled to priority processing of building and engineering approvals subject to the approval of <br /> the city manager. A project eligible for priority processing shall be assigned to city engineering and /or <br /> building staff and processed in advance of all nonpriority items. (Ord. 1818 1, 2000) <br /> 17.44.080 Alternatives to constructing inclusionary units on -site. <br /> The primary emphasis of this inclusionary zoning ordinance is to achieve the inclusion of affordable housing <br /> units to be constructed in conjunction with market rate units within the same project in all new residential <br /> projects. However, the city acknowledges that it may not always be practical to require that every project satisfy <br /> its affordable housing requirement through the construction of affordable units within the project itself. <br /> Therefore, the requirements of this chapter may be satisfied by various methods other than the construction of <br /> inclusionary units on the project site. Some examples of alternate methods of compliance appear below. As <br /> housing market conditions change, the city may need to allow alternatives to provide options to applicants to <br /> further the intent of providing affordable housing with new development projects. <br /> A. Off -Site Projects. Inclusionary units required pursuant to this chapter may be permitted to be <br /> constructed at a location within the city other than the project site. Any off -site inclusionary units must <br /> meet the following criteria: <br /> 1. The off -site inclusionary units must be determined to be consistent with the city's goal of <br /> creating, preserving, maintaining, and protecting housing for very low, low, and moderate income <br /> households. <br /> 2. The off -site inclusionary units must not result in a significant concentration of inclusionary <br /> units in any one particular neighborhood. <br /> 3. The off -site inclusionary units shall conform to the requirements of all applicable city <br /> ordinances and the provisions of this chapter. <br /> 4. The occupancy and rents of the off -site inclusionary units shall be governed by the terns of a <br /> deed restriction, and if applicable, a declaration of covenants, conditions and restrictions similar to <br /> that used for the on -site inclusionary units. <br /> The affordable housing agreement shall stipulate the terms of the off -site inclusionary units. If the <br /> construction does not take place at the same time as project development, the agreement shall require the <br /> units to be produced within a specified time frame, but in no event longer than five years. A cash deposit or <br /> bond may be required by the city, refundable upon construction, as assurance that the units will be built. <br /> B. Land Dedication. An applicant may dedicate land to the city or a local nonprofit housing developer in <br /> place of actual construction of inclusionary units upon approval of the city council. The intent of allowing a <br /> land dedication option is to provide the city or a local nonprofit housing developer the free land needed to <br /> make an inclusionary unit development feasible, thus furthering the intent of this chapter. <br /> The dedicated land must be appropriately zoned, buildable, free of toxic substances and contaminated soils, <br /> and large enough to accommodate the number of inclusionary units required for the project. The city's <br /> acceptance of land dedication shall require that the lots be fully improved, with infrastructure, adjacent <br /> utilities, grading, and fees paid. <br /> C. Credit Transfers. In the event a project exceeds the total number of inclusionary units required in this <br /> chapter, the project owner may request inclusionary unit credits which may be used to meet the affordable <br /> housing requirements of another project. Inclusionary unit credits are issued to and become the possession <br /> of the project owner and may not be transferred to another project owner without approval by the city <br /> http: /gcode.us/ codes /pleasanton /view.php? topic =17- 17_44 &showAll =1 &frames =on 4/5/2010 <br />