My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
050410
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2010 3:01:49 PM
Creation date
4/29/2010 3:01:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/4/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX C <br /> FY 2008 -09 CAPITAL IMPROVEMENT PROGRAM <br /> WATER PROJECTS <br /> Actuals <br /> Expansion Replacement <br /> CIP t! Fund Fund Total <br /> 355,497 345 <br /> 081033 Black Ave Utilities (Balance of project in Sewer CIP and Streets CIP) 193,968 $193,968 <br /> 081040 Annual Replacement of Water Meters 50 <br /> 802011 Committee Valley Water Retailers $0 <br /> 941015 Del Valle Parkway Water Main Extension $0 <br /> 971013 Water Connection Fee Update $0 <br /> 971014 Water System Master Plan Update $0 <br /> 991033 Generator Study (Water Portion) $0 <br /> 999999 General Fund Utility Cut Patching (moved from transfers above) 112,115 $112,115 <br /> 999999 General Fund CIP Engineering (moved from transfers above) 1,202 307,001 $308,203 <br /> TOTAL WATER PROJECTS $3,914 $1,493476 $1,497,390 <br /> ENDING WATER FUND BALANCE $1.095,014 $8,752,634 $9,847,648 <br /> Page CIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.