Laserfiche WebLink
APPENDIX C <br /> FY 2008 -09 CAPITAL IMPROVEMENT PROGRAM <br /> STREETS PROJECTS <br /> Actuals <br /> Streets Traffic Traffic Grants Dev Assess <br /> OP GF CIP Gas Tax Measure B Dev Fee Fee- Bernal 558,561 Contrib Districts Total <br /> 160 550- 552,568 535,575 161,166 168 563 499 165, 625,629 <br /> 005008 Dublin Canyon Road (Eastbound) Widening at Foothill Road 80 <br /> 005011 Foothill Road Widening at Dublin Canyon Road $0 <br /> 005017 1 -580 Corridor Management/Signals, Phase 1 $0 <br /> 005024 Hopyard Road and Owens Drive Widening Phase 11 (NPID #1) 80 <br /> 005030 Del Valle Parkway: Eat from First Str to California Ave (Add! Funding) <br /> 005068 Bernal /1-680 Interchange 227.041 8227,041 <br /> 015032 Mohr Ave Sidewalk Construction: Kolln Str to Abandoned Railroad ROW 108,955 $108,955 <br /> 015041 Tri- Valley Transportation Development Fee Reserve $0 <br /> 025015 Sunol Blvd at 1 -680 South Bound OtT Ramp: Install New Traffic Signal <br /> 025023 Dougherty Valley Mitigation Revenue Reserve $0 <br /> 035006 Happy Valley Bypass Road <br /> Hacienda Drive fe Owens Drive Reconfigure Intersection and Upgrade <br /> 035020 Traffic Signal 80 <br /> 045018 Bernal- Meadowlark Drive Street Improvements SO <br /> 055006 Signal Bernal Fire Station 4 <br /> 055021 Evaluation and Reclassification of Street Surfaces <br /> 055022 Old Stanley Blvd. Improvements' Main Street to First Street 5,202 $5,202 <br /> 055026 Second Bridge over Arroyo de la Laguna at Bernal 80 <br /> 005012 Annual Sidewalk Maintenance SO <br /> 065055 Neighborhood Traffic Calming Devices 5.516 55.516 <br /> 075003 Annual Resurfacing of Various Streets SO <br /> 075004 Annual Slurry Sealing of Various Streets 136 155,706 $155,842 <br /> 075005 Annual Sidewalk and Intersection Ramp Installations 17.153 817,153 <br /> 075007 Annual Traffic Buttons and Line Markers Installation 2,258 $2.258 <br /> 075009 Annual Curb and Gutter Replacements for Street Resurfacing Projects 217.920 $217.920 <br /> 075012 Annual Sidewalk Maintenance 187,337 $187.337 <br /> 075014 Traffic Signal Vineyard Gil Pietronave Lane 192,851 $192.851 <br /> 075021 Evaluation and Reclassification of Street Surfaces 22,944 822,944 <br /> 075032 Upgrade Traffic Signal Master Software 53,358 853,358 <br /> Santa Rita Road Francisco Street Traffic Signal Design Potential <br /> 075035 Installation <br /> 075039 Bi- Annual Flashing Beacons In- Pavement Flashers 2,446 $2.446 <br /> 081033 Black Ave Utilities Balance of project is in Water CIP and Sewer CIP) 104,524 $104,524 <br /> 085003 Annual Resurfacing of Various Streets 3.678 1,793,240 254,161 58,432 $2,109,511 <br /> 085004 Annual Slurry Sealing of Various Streets 80 <br /> 085005 Annual Sidewalk and Intersection Ramp Installations 39,027 839,027 <br /> 085007 Annual Traffic Buttons and Line Markers Installation 68.251 $68,251 <br /> 085009 Annual Curb and Gutter Replacements for Street Resurfacing Projects 126 142.165 $142,291 <br /> Page C5 <br />