My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
050410
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2010 2:54:45 PM
Creation date
4/29/2010 2:54:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/4/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> The design package for the Old Stanley Boulevard Improvement Project, CIP No. <br /> 055022, was completed in 2008. The project includes construction of a new roadway <br /> section, concrete curb, gutter and sidewalk; landscaping; decorative street lighting; and <br /> sewer and storm drain improvements. <br /> At the October 20, 2009 meeting, City Council approved a Professional Services <br /> Agreement with Bellecci Associates in the amount of $233,608, for design and <br /> engineering services for the Stanley Boulevard Underground Utility District; authorized <br /> using existing project funds for the consultant design and for PG &E design, plan review <br /> and approval costs; and directed staff to initiate formal proceedings to form <br /> Underground Utility District UUD- 09 -01. Estimated costs for PG &E's efforts on the <br /> project are $80,000. <br /> DISCUSSION <br /> Rule 20B requires the City to establish the Underground Utility District. The formation <br /> process includes a public hearing and a formal resolution to underground the overhead <br /> utilities specifying the exact limits of the District and stating the public necessity of the <br /> conversion. <br /> The proposed Underground Utility District UUD -09 -01 would underground the existing <br /> overhead utility lines on Stanley Boulevard between Santa Rita Road and First Street. <br /> This proposed district includes 31 parcels composed of single family residential, high <br /> density residential and commercial properties. The utilities to be undergrounded include <br /> PG &E electrical, AT &T, Comcast Cable TV, and the City of Pleasanton street light <br /> wiring. A few parcels in the proposed district were undergrounded previously, as <br /> required by the City of Pleasanton's "conditions of approval" for new development. <br /> Submitted by: Fiscal Review: Approved by: <br /> 1 <br /> Brian Dolan David P. Culver Nelson Fialho <br /> Director of Finance Director City Manager <br /> Community Development <br /> Attachments: <br /> 1. Resolution <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.