Laserfiche WebLink
Figure ES -1 <br /> Overview of the Comprehensive Rate Study <br /> Compares the sources of funds (revenues) to <br /> Revenue Requirement Analysis the expenses of the utility to determine the <br /> overall rate adjustment <br /> 4 <br /> Allocates the revenue requirements to the <br /> Cost of Service Analysis various customer classes ofsetvice in a fair <br /> and equitable" manner <br /> 4 <br /> Considers both the level and structure of the <br /> Rate Design Analysis rate design to collect the target level of <br /> revenues <br /> The revenue requirement analysis and the rate design analysis were conducted as part of this <br /> study. At this time a cost of service analysis was not completed for the City. The development <br /> of cost based rates can be accomplished through a review of the revenue requirement and rate <br /> design analyses. <br /> Summary of the Revenue Requirement Analysis <br /> The development of the revenue requirement is the first analytical step in the rate study process. <br /> A revenue requirement analysis determines the overall adequacy of the City's local sewer rates. <br /> In developing the local sewer revenue requirement, it was assumed that the utility must <br /> financially "stand on its own" and be properly and adequately funded. <br /> The initial step in calculating the revenue requirement was to establish a "test period or time <br /> frame of reference for the revenue requirement analysis. For this particular study, the revenue <br /> requirement was developed for the eight -year projected time period of FY 2010 FY 2017. In <br /> projecting the revenues and operating expenses for the utility, the primary inputs to the analysis <br /> were the City's financial documents and the revenue and expenses as developed by City staff. <br /> The City has a significant level of capital improvement projects planned over the study's time <br /> horizon. More importantly, in looking beyond the next eight years, the number and size of the <br /> replacement sewer projects is anticipated to ramp up significantly. The City and its engineering <br /> consultant are in the process of updating the Water and Wastewater Asset Management Study, <br /> which includes an analysis of the local sewer collection and pumping system. The Asset <br /> Management Study was not completed at the time of this study, but it was in a draft form which <br /> allowed HDR to gain an understanding of the potential capital replacement expenditures over the <br /> next fifty to seventy -five years. The value of the Asset Management Study to this rate study is <br /> that it provided a road map of where the City should be positioned in eight years, as it relates to <br /> capital improvement funding from rates and capital reserve fund balances. <br /> la Executive Summary ES-2 <br /> City of Pleasanton Local Sewer Rate Study <br />