Laserfiche WebLink
Table of Contents <br /> Executive Summary <br /> 1 Development of the Revenue Requirement <br /> 1.1 Introduction 1 -1 <br /> 1.2 Determining the Time Period and Method of Accumulating Costs 1 -1 <br /> 1.3 Projection of Revenues 1 -3 <br /> 1.4 Projection of Operation and Maintenance Expenses 1 -4 <br /> 1.5 Projection of Sewer Capital Improvement Projects Funded from <br /> Rate Revenues 1 -4 <br /> 1.6 Projection of Debt Service Payments 1 -5 <br /> 1.7 Summary of the Revenue Requirements 1 -5 <br /> 1.8 Rate Transition Plan I -7 <br /> 1.9 Consultant's Conclusions and Recommendations 1 -8 <br /> 1.10 Summary 1 -8 <br /> 2 Development of the Local Sewer Rate Designs <br /> 2.1 Introduction 2- l <br /> 2.2 Rate Design Criteria and Considerations 2 -1 <br /> 2.3 Development of the Proposed Local Sewer Rate Designs 2 -2 <br /> 2.4 Summary of the Proposed Sewer Rate Designs 2 -3 <br /> IDA Table <br /> Cify of Pleasanto Contents n Local Sewer Rate Study <br />