Budget <br /> Based on previous similar projects, staff is requesting a 15% project contingency in the <br /> amount of $59,914 to fund unforeseen change orders. Typical pavement change orders <br /> relate to isolated soil conditions that require removal and replacement. Unsuitable soils <br /> are not known until such time as the pavement is removed during local base repair and <br /> the soil condition is exposed in the field, requiring either remedial treatment or removal. <br /> As a result of this contingency, as well as required testing services and the separate <br /> purchase of traffic video detection equipment, the projected total project budget is <br /> $481,020. <br /> Since the ARRA program funds projects on a reimbursement basis, the City will initially <br /> need to use local funding to meet the cash flow needs of the project. Staff is proposing <br /> to use funds remaining in the completed Annual Resurfacing of Various City Streets <br /> project, CIP No. 095003 (presented for acceptance concurrently with the award of this <br /> project). At the time the Annual Resurfacing contract was awarded, the City was aware <br /> that the State might delay or reduce some street funding; therefore, the construction <br /> budget was limited to cash on hand ($1,801,008) rather than using the originally <br /> budgeted amount of $2,250,000. The balance remaining in the approved construction <br /> budget for the Annual Resurfacing project is $115,439. The Annual Curb and Gutter <br /> project, CIP No. 085009, is being accepted concurrently with the award of this <br /> pavement rehabilitation project. Staff is recommending the transfer of that project <br /> balance ($40,578) to the resurfacing project, CIP No. 095003, since a portion of the <br /> funding for the curb and gutter project was provided by the former resurfacing project. <br /> Additional funds are currently available from gas tax monies the City has received from <br /> the State in the amount of $267,863, representing July, August and September 2009 <br /> revenues. All totaled, the balance of these available funds is $423,880. The City of <br /> Pleasanton expects to receive another five months' worth of gas tax payments in April, <br /> as well as nine months' worth of delayed Proposition 42 funding in April and May 2010. <br /> Those funds would be used to complete the funding of the originally budgeted <br /> resurfacing project. Funds are, therefore, expected to be received for CIP No. 095003 <br /> before the final $57,140 is necessary for this pavement rehabilitation project. <br /> Additionally, partial reimbursement requests may be submitted for ARRA funds in order <br /> to assist with cash flow if necessary. Once ARRA funding has been received, staff will <br /> reimburse the Annual Resurfacing project. <br /> Submitted by: Fiscal Review: Appro ed by: <br /> cod <br /> Brian Dolan David P. Culver Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Bid summary <br /> 2. Funding and Estimated Expenditures Summary <br /> 3. Draft construction contract <br /> Page 3 of 3 <br />