Laserfiche WebLink
54. That the developer submit a refundable cash bond <br /> for hazard control prior to approval of the final map. <br /> The amount of this bond will be determined by the <br /> City Engineer. (Approximately $100 per lot - <br /> $2500 minimum.) <br /> <br /> 55. That this development provide a safe and effective <br /> circulation system for bicycles and pedestrians. These <br /> facilities shall be designed and installed to the satis- <br /> faction of the City Engineer and shall be separated from <br /> vehicular traffic whenever possible. <br /> <br /> 56. That the developer submit detailed landscape and <br /> irrigation plans as part of the improvement plans. <br /> These plans should include a street tree planting <br /> plan; landscape plans for medians, buffer strips, <br /> and any right-of-way landscape areas; and an <br /> irrigation plan which provides for automatic controls. <br /> <br /> 57. That the developer (subdivider) may file multiple final <br /> maps prior to the expiration of the conditionally approved <br /> tentative map for this development; provided, however, that <br /> each such final map filed shall provide for all normal and <br />· reasonable public improvements required by the City to <br />) serve that portion of this development to the satisfaction <br /> of the City Engineer. <br /> <br /> 58. That the developer submit a detailed utility layout plan with <br /> the final improvement plans. <br /> <br /> Uy the homeowners association e ished by the project <br /> or landscape maintenance district. <br /> // <br /> <br /> <br />