My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
031610
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2010 12:57:43 PM
Creation date
3/10/2010 12:57:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/16/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2. Estimated Costs Yrs 2 -5 of Post construction Monitoring <br /> Bernal Bridge Mission Creek Wetland Riparian Mitigation Monitoring Reporting <br /> Expenses <br /> Direct Expenses <br /> Mileage 4480 miles 0.55 $2,240 <br /> Equipment Costs (see Table 3) $10,200 <br /> Per Diems <br /> Reimbursable Costs <br /> Other Travel, Subsistence trips $0 <br /> Postage, deliveries, express mail $200 <br /> Maps and Aerial Photos $0 <br /> Outside Copying, Blueprint $1,500 <br /> Analytical Laboratory Fees $0 <br /> Materials and Supplies $0 <br /> Permits, Licenses or Agency Inspection fees client responsibility $0 <br /> Other $0 <br /> Expenses Subtotal $14,140 <br /> Labor Subtotal (Table 1) $95,882 <br /> Balance 10% contingency (labor expenses) $5,172 <br /> Notes TOTAL w/ CONTINGENCY $115,194 <br /> Table 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.