My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
031610
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2010 11:28:43 AM
Creation date
3/10/2010 12:29:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/16/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC 2009 Strategic Expenditure Plan Update <br /> Updated Project Descriptions August 4, 2009 <br /> B -8. Camino Tassajara Widening, East Blackhawk Drive to County Line <br /> TVTC Lead Sponsor: <br /> Contra Costa County <br /> Lead Agency: <br /> Contra Costa County <br /> Project Description: <br /> This project will widen Camino Tassajara from two to four lanes from approximately 2,000 feet <br /> east of Blackhawk Drive to Windemere Parkway; and widen Camino Tassajara from two to six <br /> lanes from Windemere Parkway to the Contra Costa/Alameda County line. Widening will <br /> include the addition of shoulders to meet current County road standards. The project will also <br /> realign two horizontal curves located approximately 0.5 miles north of Windemere Parkway and <br /> approximately 0.1 miles north of the Contra Costa/Alameda County line. <br /> This project will increase capacity and safety on Camino Tassajara, and will help mitigate the <br /> impacts of local and regional growth in housing and employment within the Tri- Valley. An <br /> increase in the average daily traffic on Camino Tassajara is anticipated due to recent <br /> improvements on Dougherty Road, Windemere Parkway, Tassajara Road and Fallon Road. This <br /> is appealing to commuters looking for an alternative route to avoid congestion at the I -680/ I -580 <br /> interchange. Furthermore, the realignment of the two horizontal curves will improve safety for <br /> motorists and reduce the number of collisions in these areas. A total of three traffic collision <br /> fatalities have been reported within the last two years at these locations. The proposed project is <br /> included in the Contra Costa County General Plan. <br /> Status: <br /> Preparation of a project study report is in progress. <br /> Phasing and Schedule: <br /> Phasing and Scheduling for this project is unavailable pending completion of the project study <br /> report. <br /> Kimley -Horn and Associates, Inc. Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.