My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
031610
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2010 11:28:43 AM
Creation date
3/10/2010 12:29:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/16/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC 2009 Strategic Expenditure Plan Update <br /> Updated Project Descriptions August 4, 2009 <br /> B -2. Fifth Eastbound Lane on I -580 between Santa Rita and Vasco Road <br /> TVTC Lead Sponsor: <br /> 1 City of Pleasanton <br /> Lead Agency: <br /> r <br /> Caltrans <br /> -pM Project Description: <br /> The existing main line lane drop <br /> on eastbound 1 -580 at Santa Rita <br /> Road is a bottleneck that causes <br /> significant peak -hour congestion, and results in level of service "F" conditions during the PM <br /> peak hour, with queuing that often extends back to I -680 and beyond. The project would <br /> construct a fifth eastbound lane on I -580 between Santa Rita Road and Vasco Road, eliminating <br /> the lane drop at Santa Rita Road. This project may be constructed in stages. Completion of <br /> eastbound auxiliary lanes between Fallon Road and Vasco Road may be an initial stage. <br /> Status: <br /> The auxiliary lane components of this project between Fallon Road and Isabel Avenue and <br /> between First Street and Vasco Road are funded and will be constructed in conjunction with the <br /> I -580 Eastbound HOV Lane project (Project A -5A). The remaining components of the project <br /> have not begun. <br /> Phasing and Schedule: <br /> A portion of this project will be constructed in conjunction with the I -580 eastbound HOV lane <br /> project. The Phasing and Schedule for the remaining components is nit available at this time. <br /> Funding Sources: <br /> Cost (h%iitlions, 2006) $13130 <br /> Funding (Millions, 2006) $0.00 <br /> Total Funding (Millions, 2006) $0.00 <br /> Funding Shortfall (Millions, 2006) $131.30 <br /> Kimley -Horn and Associates, Inc. Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.