My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
031610
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2010 11:28:43 AM
Creation date
3/10/2010 12:29:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/16/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TVTC 2009 Strategic Expenditure Plan Update <br /> Updated Project Descriptions August 4, 2009 <br /> A -2A. Route 84 Expressway I -580 to I -680 <br /> TVTC Project Sponsor: <br /> siormed <br /> Bt.. CaMnuct :MM.1 Interchange <br /> wM 2 l.m ow' W..: W. d Po, la B.. imMe 1B <br /> b Y.GN .M nmare PwbY m ^P. U..vM.n <br /> City of Livermore <br /> snd W Construct Kris overpass <br /> m Wm/ft u.aewnpe. -e <br /> r Lead Agency: <br /> Alameda County Transportation <br /> woos' aw° J Improvement Authority <br /> Project Description: <br /> This project will widen and reconstruct <br /> Route 84 as an expressway in several <br /> R, stages using a variety of funding <br /> sources. The ultimate configuration is <br /> „t,,. 8 i0111 i8 expected to consist of six lanes from I <br /> Frage me( Construe' w 580 to Stanley Boulevard and four lanes <br /> Slags 2: Constzucl 4 Yee expressway. from Stanley Boulevard to I -680. In <br /> addition, Route 84 will be realigned to <br /> expressway standards between Ruby <br /> Na.: Bpm.m ®I.TVICWProtect 2B Hill Drive and south of Pigeon Pass. <br /> Seamen ®'ru wit* pogo 2 Other near -term projects will relocate <br /> utilities between Airway Boulevard and <br /> Jack London Boulevard, and widen and relocate utilities between Jack London Boulevard and <br /> Ruby Hill Drive. Subsequent stages include realignment, relocation, and widening between <br /> Pigeon Pass and I -680, ramp improvements at the Route 84/1 -680 interchange, and construction <br /> of a southbound auxiliary lane on I -680 from Route 84 to Andrade Road. <br /> Status: <br /> A Project Study Report of the entire route was completed in 2005 and was funded through a $1 <br /> million allocation of TVTDF funds. The project has been segmented into three primary sections: <br /> o Segment 1 I -580 to Airway Boulevard. This segment is the I- 580/Route 84 Interchange <br /> project listed separately as Project A -2B <br /> o Segment 2 Airway Boulevard to Ruby Hills Drive. This segment will be constructed in <br /> three phases: <br /> o Phase 1 Isabel AvcnucNineyard Avenue intersection realignment. This phase <br /> was completed in 2008, and was funded with $2.3 million of TVTDF 20% funds. <br /> o Phase 2 Airway Boulevard to Jack London Boulevard. This stage received a <br /> $5.2 million allocation of TVTDF funds. Environmental clearance was obtained <br /> in 2007 with the I -580 /Route 84 Interchange project. PS &E was completed in <br /> 2008. Construction activity will commence in 2009 and be completed by 2011. <br /> o Phase 3 Jack London Boulevard to Ruby Hills Drive. This stage is included as <br /> Project 24 in the Alameda County Measure B program. Environmental clearance <br /> Kimley -Horn and Associates, Inc. Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.