My WebLink
|
Help
|
About
|
Sign Out
ORD 1109
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1101 - 1200
>
ORD 1109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2006 1:36:17 PM
Creation date
3/17/1999 6:32:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1109
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />c.4 Fact. See Section XII (for infeasibility of <br />Alternatives). <br /> <br />D. Siqnificant Effect. Placement of fill from Arroyo de <br />la Laguna on agricultural lands. <br /> <br />d.l Findinq. The mitigation measure incorporated <br />into the Project has caused this effect to be <br />avoided. <br /> <br />d.2 Fact. Fill has been located on the site of a <br />residential development currently under con- <br />struction by Ponderosa Homes, Inc. <br /> <br />E. Siqnificant Effect. Potential destruction of <br />downstream aquatic populations during construction in <br />the vicinity of Arroyo de la Laguna. <br /> <br />e.l Findinq. The mitigation measure incorporated <br />into the Project will avoid the effect. <br /> <br />e.2 Fact. Condition 68 requires Developer to <br />maintain constant flow during construction. <br /> <br />x. Visual. <br /> <br />A. Siqnificant Effect. Change in visual character of <br />the area, including loss of distant vistas and agri- <br />cultural open space. <br /> <br />a.l Findinq. The mitigation measure to leave gaps <br />in landscaping to afford views and retain <br />panoramic views of Pleasanton Ridge from site is <br />infeasible. <br /> <br />a.2 Fact. A planned streetscape scene comprises the <br />unifying aesthetic concept of the Project and is <br />a major factor in marketing the Project. <br /> <br />a.3 Fact. The high standards and abundant urban <br />landscaping would be beneficial in softening the <br />urban environment by minimizing dust, certain <br />pollutants and noise. <br /> <br />B. Significant Effect. Temporary disturbance of site <br />and channels during construction. <br /> <br />b.l Finding. The mitigation measure incorporated <br />into the Project to reduce temporary disturbance <br />substantially lessens the effect. <br /> <br />18. <br />
The URL can be used to link to this page
Your browser does not support the video tag.