PLEASANTON PERMIT CENTER REMODEL PROJECT <br /> PLEASANTON, CA <br /> Liquidated damages for delay shall only cover substitute facilities, administrative costs, overhead, interest <br /> on bonds, lost revenues and general loss of public use damages suffered by City as a result of delay. <br /> Liquidated damages shall not cover the cost of completion of extended Construction Management Service, <br /> additional A/E Services, the Work, damages resulting from defective work, or damages suffered by others <br /> who then seek to recover their damages from City (for example, delay claims of other contractors, <br /> subcontractors, tenants, or other third parties), and defense costs thereof. <br /> 7. Contract Price <br /> City shall pay Contractor the Contract Sum one hundred fourteen thousand eight hundred eighty nine <br /> dollars $114,889. <br /> The Contract Sum above includes within its amount the following allowances that the City may or may not <br /> authorize, and to the extent unspent, shall revert to the City: N/A <br /> 8. Contractor's Representations <br /> Contractor makes the following representations and warranties: <br /> A) Contractor has visited the Site and has examined thoroughly and understood the nature and extent <br /> of the Contract Documents, Work, Site, locality, actual conditions, as -built conditions of the Site, and <br /> all local conditions, federal, state and local laws and regulations that in any manner may affect cost, <br /> progress, performance or furnishing of Work or which relate to any aspect of the means, methods, <br /> techniques, sequences or procedures of construction to be employed by Contractor and safety <br /> precautions and programs incident thereto. <br /> B) Contractor has examined thoroughly and understood all reports of exploration and tests of <br /> subsurface conditions, as -built drawings, drawings or reports, etc. made available by City for <br /> Bidding purposes, of physical conditions. <br /> C) Contractor has conducted or obtained and has understood all such examinations, investigations, <br /> explorations, tests, reports and studies (in addition to or to supplement those referred to in Article 8- <br /> B above) that pertain to the subsurface conditions, as -built conditions, Underground Facilities and <br /> all other physical conditions at or contiguous to the Site or otherwise that may affect the cost, <br /> progress, performance or furnishing of Work, as Contractor considers necessary for the performance <br /> or furnishing of Work at the Contract Sum, within the Contract Time and in accordance with the <br /> other terms and conditions of the Contract Documents, including specifically the provisions of the <br /> General Conditions; and no additional examinations, investigations, explorations, tests, reports, <br /> studies or similar information or data are or will be required by Contractor for such purposes. <br /> D) Contractor has correlated its knowledge and the results of all observations, examinations, <br /> investigations, explorations, tests, reports and studies with the terms and conditions of the Contract <br /> Documents. <br /> AGREEMENT <br /> 00520 Page 3 of 5 <br />