Laserfiche WebLink
92. The owner/contractor shall submit two copies of the site soils report to the Chief <br />Building and Safety Official for third party peer review and shall pay for such <br />review at the time specified by the Building and Safety Official, but in all cases <br />before the issuance of a grading permit. <br />93. The owner of a residential lot who, whether on his/her own or through a contractor <br />(hereafter, "owner/contractor"), obtains a building permit shall show the proposed <br />green building checklist on one of the first two pages of the plans submitted for <br />the issuance of a building permit. The sheet number(s) where each checklist item <br />is addressed in the plan set shall be noted on the checklist. All proposed green <br />building measures shall be shown throughout the plan set, as appropriate, as <br />determined by the Planning Director and the Chief Building and Safety Official. A <br />special inspection by a representative from the Planning Department shall be <br />coordinated with regards to landscaping, irrigation, and exterior materials. All of <br />the green building measures indicated on the approved checklist shall be <br />inspected and approved by either the City of Pleasanton, a qualified specialist, or <br />the applicant shall provide written verification by the project engineer, architect, <br />landscape architect, or designer. This condition shall appear in the design <br />guidelines. <br />94. Prior to final building permit inspection and occupancy, a final inspection and <br />approval by the Planning Department is required in order to confirm that all <br />conditions of approval prior to occupancy have been satisfied. <br />95. Prior to the first framing inspection, the height of the primary structure shall be <br />surveyed and verified as being in conformance to the approved building heights <br />shown on the building permit plan sets. Said verification is the owner's/ <br />contractor's responsibility and shall: <br />• Be performed by a licensed land surveyor or civil engineer. <br />• Be completed and provided to the Planning Department. <br />• Reviewed and determined to be correct by the Planning Department. <br />Fire Department Requirements <br />96. The project developer and the owner/contractor shall meet all requirements of <br />the Pleasanton Fire Code (Pleasanton Municipal Code, Chapter 20.24) and this <br />PUD approval for the subdivision/lots. <br />97. The owner/contractor shall keep the construction site free of fire hazards from the <br />start of lumber construction until the final inspection. <br />98. The Fire Chief and the City Engineer shall approve the number, type, and <br />location of all public fire hydrants and the Fire Chief and the Chief Building and <br />Safety Official of all private fire hydrants. <br />Exhibit 8 Page 37 of 39 Ordinance No. 1961 <br />PUD-33, Oak Grove <br />