Laserfiche WebLink
TRI- VALLEY ORTHO PROJECT 2010 3D 1 WEST <br /> Scope of Services <br /> Photogrammetry with Digital Mapping Camera <br /> The technical methodology will utilize a traditional 100% photogrammetric approach, <br /> resulting in high quality contours and orthophotography using imagery from a digital <br /> mapping camera. Along with breaklines, supplemental DTM points will be updated or <br /> collected to support the contour update. The contour interval for urban areas is 2' and <br /> 10' for the Outer Livermore area. <br /> Project Planning <br /> The Project Manager will meet with the client project team in person to review the project <br /> methodology, tasks, deliverables and schedule. All phases of the project will be <br /> reviewed in detail to insure client expectations are fully met or exceeded. Upon <br /> conclusion of this task, project planning maps will be finalized and a final scope of work <br /> will be approved by the client(s). As required, deliverables and costs will be broken <br /> down for each project area (City). <br /> Surveying Map Control <br /> Prior to photo acquisition, survey control points will be premarked to act as part of the <br /> map control package. A combination of existing and new points will probably be used. <br /> Preliminary plans call for a total of approximately 20 premarked points as well as <br /> additional vertical control utilizing non premarked points. In addition to ground surface <br /> points, the project will be flown with Airborne GPS (AGPS) resulting in a virtual control <br /> point for each exposure point within the overall flight plan. The combination of these two <br /> methods will provide the control necessary to meet accuracy requirements for DTM and <br /> orthophoto generation. <br /> Survey work performed within the project area will be coordinated with the client Project <br /> Coordinator prior to work starting. Control point locations and access issues will be <br /> discussed and approved to support a smooth and issue free survey. All work will be <br /> surveyed by or under the supervision of a licensed California Land Surveyor. The Vice <br /> President of 3Di West is a licensed land surveyor in the State of California. <br /> Coordinate System: California State Plane, Zone 3 <br /> Horizontal Datum: NAD '83 (Spheroid to be specified in Survey Report) <br /> Vertical Datum: NAVD '88 Unit of Measure: U.S. Survey Feet <br /> Aerial Photography Aerial Triangulation <br /> Aerial imagery will be acquired with a high quality digital mapping camera at a suitable <br /> photo scale and resolution to support the mapping deliverables. The digital imagery will <br /> meet or exceed all industry quality standards for projects of this type and scope. As <br /> requested, all photography will be acquired when the sun angle is greater than 35 <br /> degrees in the April May time frame of 2010. <br /> Special care will be taken to obtain good stereo coverage of the 580/680 interchange <br /> and along Interstate 580. Aerial- Triangulation (AT) will be performed to guarantee a <br /> high quality fit between imagery, survey control and the resulting contour dataset. The <br /> AT will reveal any photogrammetric image fit issues should they be present within the <br /> photography or survey control, thus providing a good quality control check for both <br /> image and survey data sets. <br /> PAGE 2 <br />