Laserfiche WebLink
APPENDIX C <br /> FY 2008 -09 CAPITAL IMPROVEMENT PROGRAM <br /> STREETS PROJECTS <br /> Acme's <br /> Streets Traffic Traffic Grants Dev Assess <br /> CIP GF CEP Gas Tax Measure 8 Dev Fee Fee Bernal 558, 561 Contrib Districts Total <br /> 160 550 552,568 535,575 161,166 168 563 499 165, 625,629 <br /> oosoos Dublin Canyon Road (Eastbound) Widening at Foothill Road $0 <br /> nom 1 Foothill Road Widening at Dublin Canyon Road $0 <br /> 005017 1 -580 Corridor Management/Signals, Phase I $0 <br /> 005024 Hopyard Road and Owens Drive Widening Phase II (NPID #I) $0 <br /> 005030 Del Valle Parkway: Ext from First Str to California Ave (Addl Funding) $0 <br /> 005068 Bernal /I -680 Interchange 227,041 5227,041 <br /> 015032 Mohr Ave Sidewalk Construction: Kolln Str to Abandoned Railroad ROW 108,955 $108,955 <br /> 015041 Tri- Valley Transportation Development Fee Reserve $0 <br /> 025015 Sunol Blvd at 1 -680 South Bound Off Ramp: Install New Traffic Signal 50 <br /> 025023 Dougherty Valley Mitigation Revenue Reserve 50 <br /> 035006 Happy Valley Bypass Road $0 <br /> Hacienda Drive Owens Drive: Reconfigure Intersection and Upgrade <br /> 035020 Traffic Signal $0 <br /> 045018 Bernal- Meadowlark Drive Street Improvements $0 <br /> 055006 Signal Bernal Fire Station 4 $0 <br /> 055021 Evaluation and Reclassification of Street Surfaces 50 <br /> 055022 Old Stanley Blvd. Improvements: Main Street to First Street 5,202 $5,202 <br /> 055026 Second Bridge over Arroyo de la Laguna al Bernal $0 <br /> 065012 Annual Sidewalk Maintenance 50 <br /> 065055 Neighborhood Traffic Calming Devices 5,516 55,516 <br /> 075003 Annual Resurfacing of Various Streets $0 <br /> 075004 Annual Slurry Sealing of Various Streets 136 155,706 $155,842 <br /> 075005 Annual Sidewalk and Intersection Ramp Installations 17,153 $17,153 <br /> 075007 Annual Traffic Buttons and Line Markers Installation 2,258 $2,258 <br /> 075009 Annual Curb and Gutter Replacements for Street Resurfacing Projects 217,920 5217,920 <br /> 075012 Annual Sidewalk Maintenance 187,337 $187,337 <br /> 075014 Traffic Signal Vineyard Pietronave Lane 192,851 $192,851 <br /> 075021 Evaluation and Reclassification of Street Surfaces 22,944 522,944 <br /> 075032 Upgrade Traffic Signal Master Software 53,358 $53,358 <br /> Santa Rita Road Francisco Street Traffic Signal Design Potential <br /> 075035 Installation $0 <br /> 075039 Bi- Annual Flashing Beacons In- Pavement Flashers 2,446 $2,446 <br /> 081033 Black Ave Utilities (Balance of project is in Water CIP and Sewer CIP) 104,524 $104,524 <br /> 085003 Annual Resurfacing of Various Streets 3,678 1,793,240 254,161 58,432 52,109,511 <br /> 085004 Annual Slurry Sealing of Various Streets 50 <br /> 085005 Annual Sidewalk and Intersection Ramp Installations 39,027 539,027 <br /> 085007 Annual Traffic Buttons and Line Markers Installation 68,251 568,251 <br /> 085009 Annual Curb and Gutter Replacements for Street Resurfacing Projects 126 142,165 $142,291 <br /> Page C5 <br />