Laserfiche WebLink
CAPITAL IMPROVEMENT PROGRAM <br />WATER PROJECTS <br /> <br /> Expansion Replacement <br />CIP # Fund Fund Total <br /> 355 345 <br />971013 Water Connection Fee Update 12,852 0 12.852 <br />971014 Water System Master Plan Update 81.728 I 27.577 109.305 <br />97t025 Watei Well Chemical Feed System Modifications. (33%/67%) 30,949 I39.230 170.179 <br />9aloo0 Portable Generator Lon~view Booster Station 0 102.276 102.276 <br />991033 Generator Stud~, (Water Portion) 0 i 9,307 9.307 <br />991034 Up~rade Turnouts to Accommodate Chemical Readouts 28.096 I 80,974 109,070 <br />991035 Santos Ranch Road PS 510, 900.1300 Rehabilitation 0 767.734 767.734 <br />991069 Reconstruction o£Water Wells No. 5, 6. and 8 0 5.225 5.225 <br />999999 General Fund -- C1P En~ineerin~ 52.260 28.653 80.913 <br /> TOTAL WATER PROJECTS $1.183.405 $3.961,626 $5.145.031 <br /> ENDING WATER FUND BALANCE $1.267.334 $6.821.062 $8.088,396 <br /> <br />Water FY03 Ql.xls 12/I 1/2002 <br /> <br /> <br />