My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
120109
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 4:38:52 PM
Creation date
11/23/2009 1:26:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/1/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> The Valley Avenue Pedestrian and Bicycle Path Project provides an off street <br /> alternative route for pedestrians and cyclists to reach the elementary and middle <br /> schools located on Case Avenue. The pathway is considered a suggested Safe Route <br /> to School. The project consisted of removal and disposal of existing fencing, bollards <br /> and gates along the south side of Valley Avenue between Case Avenue and Sunol <br /> Boulevard. It also included construction of approximately 700 feet of paved pathway <br /> and hydro- seeding of soil areas disturbed during construction. See Attachment 2 for a <br /> copy of the project vicinity map. <br /> On July 21, 2009, the Council awarded the contract for the project to Soto Brothers <br /> Paving Company, Inc. in the amount of $45,955. At the same time, the Council <br /> authorized the Director of Community Development to approve change orders up to the <br /> project contingency amount of $9,200. There is currently a balance in CIP No. 077036 <br /> of $90,658. The primary reasons that the balance in the project is greater than the <br /> amount actually expended are that the bids came in substantially lower than the <br /> engineer's estimate and unfavorable soil conditions were not encountered. <br /> The project has been completed to the City's satisfaction and is ready for formal <br /> acceptance by the City Council. <br /> DISCUSSION <br /> Budget <br /> A summary of the project's funding sources and expenditures is presented in <br /> Attachment 1. The final contract amount is $44,207. This includes deductive change <br /> orders of $2,057.56 due to adjustments in the final quantities compared to the bid <br /> proposal estimated quantities and $475 for site clean -up. The City hired another <br /> contractor to perform the site clean -up and the City will withhold that amount from Soto <br /> Brothers' final retention. Change orders for additional work were granted in the amount <br /> of $824.56, resulting in a net deductive change order totaling $1,708 $2,057.56 <br /> $824.56 $1,708). <br /> The remaining CIP No. 077036 balance of $90,658 includes $45,658 allocated from the <br /> Metropolitan Transportation Commission Transportation Development Act (MTC <br /> TDA). These funds are only received as reimbursements for expenses incurred; and <br /> they will remain in the MTC TDA pool for allocation to a different City of Pleasanton <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.