My WebLink
|
Help
|
About
|
Sign Out
ORD 1255
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1201 - 1300
>
ORD 1255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2008 12:01:20 PM
Creation date
3/17/1999 5:06:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1255
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47. That approval of the storm drainage system be withheld <br /> pending final design and until the developer has demonstrated <br /> to the satisfaction of the City Engineer that the system is <br /> adequate, connects to an approved point of discharge, meets <br /> any and all applicable requirements of the Alameda County <br /> Flood Control District - Zone 7, meets any and all applicable <br /> requirements of the Federal Emergency Management Flood <br /> Hazard Program, and meets the immediate and long-range <br /> requirements of this development and all upstream areas <br /> intended to be drained through this development. <br /> <br />48. That electric power distribution, gas distribution, <br /> communication service, and any required alarm systems be <br /> installed underground in a joint utility trench unless <br /> otherwise specifically approved by the City Engineer. <br /> <br />49. That the developer be responsible for the installation of the <br /> street lighting system serving the development. The street <br /> lights shall be 70 watt, high pressure sodium vapor units <br /> mounted on galvanized steel poles with poured in place bases, <br /> on the LS-1C schedule per City requirements and P.G.&E. <br /> standard details unless otherwise specifically approved. <br /> Approval for the number, location, and type of electroliers <br /> shall be withheld pending final design and review by the <br /> City Engineer. <br /> <br />50. That this development provide a s~fe and effective circulation <br /> system for bicycles and pedestrians. These facilities <br /> shall be designed and installed to the satisfaction of the <br /> City Engineer and shall be separated from vehicular traffic <br /> whenever possible. <br /> <br />51. That the developer submit detailed landscape and irrigation <br /> plans as part of the improvement plans. These plans should <br /> include, where applicable, a street tree planting plan and <br /> landscape plans for medians, buffer strips, and any right-of-way <br /> landscape areas. The irrigation plan shall provide for <br /> automatic controls- <br /> <br />52. That any damage to street improvements now existing or done <br /> during construction on the subject property be repaired to the <br /> satisfaction of the City Engineer at full expense to the <br /> developer. This shall include slurry seal, Overlay, or <br /> street reconstruction if deemed warranted by the City <br /> Engineer. <br /> <br />53. That the developer's contractor(s) obtain an encroachment permit <br /> from the City Engineer prior to the start of construction. <br /> <br />54. That the developer install street trees as required per <br /> ordinance. <br /> <br />55. That all access roads and driveways on the site are <br /> hereby declared fire lanes and must be maintained <br /> and accessible at all times. Curbs must be painted <br /> red and "No Parking" signs provided to the City Standards. <br /> <br /> 2/ /84 <br /> Rev. 10/84 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.