My WebLink
|
Help
|
About
|
Sign Out
PC 051309
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2000-2009
>
2009
>
PC 051309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2017 4:40:12 PM
Creation date
9/23/2009 9:27:34 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
5/13/2009
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Stern replied that this was one of the interchanges discussed in the background <br />text. <br />Commissioner Blank stated that at the time, there was discussion that this area was in <br />sore need of landscaping. <br />Commissioner Narum noted that Program 7.6 references the gateway at Foothill and <br />I-580. She added that it seemed to her that the Santa Rita Road gateway was also <br />mentioned. <br />Chair Pearce stated that she thinks the General Plan is a good but imperfect document. <br />She noted that there has been significant public input and that she supported the <br />comments made by Commissioner Olson and Narum regarding continuing public input <br />should the document need to be modified in the future. She added that she would like <br />the Commission to recommend this course of action to the City Council. <br />Commissioner Blank moved to recommend that the City Council certify the Final <br />Environmental Impact Report and adopt the CEQA Findings, Statement of <br />Overriding Considerations, and Draft Pleasanton General Plan 2005-2025, with <br />any amendments proposed by the Planning Commission; to specifically request <br />that Janice Stern and her staff be commended for their outstanding work over the <br />past four years; and to recommend to the City Council that the City Council <br />develop contingency plans in the event that major assumptions of the General <br />Plan, e.g., housing cap, etc., are subsequently invalidated, and that these <br />contingency plans include a formal mechanism for the gathering and receiving of <br />public input. <br />Chair Pearce noted that the word “invalidated” is a fairly specific word and inquired if the <br />Commission would like to replace it with “required to be modified.” <br />Commissioner Blank stated that modification would come from the City Council and that <br />“invalidated” would refer to an outside agency. <br />Chair Pearce asked Commissioner Blank if he wanted the public input process only if <br />changes were made by an outside agency. <br />Commissioner Blank stated that he is assuming that any City Council modification <br />would go through the normal process of public input. <br />Mr. Roush stated that he believed what Chair Pearce may be suggesting is that if the <br />Commission is interested in having the Council consider some type of public input with <br />due process, whether generated by the Council or an outside force, the Commission is <br />interested in having that process in place. <br />Commissioner Blank proposed stating, “invalidated or modified” so it covers both. <br />PLANNING COMMISSION MINUTES, May 13, 2009 Page 10 of 13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.