My WebLink
|
Help
|
About
|
Sign Out
PC 081308
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2000-2009
>
2008
>
PC 081308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2017 4:37:57 PM
Creation date
9/17/2009 10:51:19 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
8/13/2008
DESTRUCT DATE
15 Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Chair Blank noted that he believed the size of the second-floor sign was the same as <br />that on the first floor. He indicated that he liked the suggestion to drop the word, <br />"Institute." <br /> <br />In response to Commissioner Olson’s question regarding the heights of the first- and <br />second-story signs, Ms. Amos replied that they were the same. <br /> <br />Commissioner Narum inquired what would happen if Valley Community Bank <br />downsized and there was room for a third tenant to come in. She stated that she <br />would not want the applicants to come back in two years requesting to put up <br />another sign for a new tenant. Chair Blank responded that he did not want to restrict <br />the applicants at this point and that the Planning Commission at that future time <br />would have to address that matter. <br /> <br />Commissioner Pearce moved to uphold the appeal, thereby overturning the <br />Zoning Administrator’s approval of only one building sign and allowing two <br />second-story signs in addition to the new monument sign, with the <br />modification that the word “Institute” be removed from the second-story sign. <br />Commissioner Narum seconded the motion. <br /> <br />Commissioner Olson suggested that the monument sign retain the word “Institute.” <br /> <br />Commissioner Pearce and Commissioner Narum accepted the amendment. <br /> <br />ROLL CALL VOTE: <br /> <br />AYES: Commissioners Blank, Narum, O'Connor, Olson, and Pearce. <br />NOES: None. <br />ABSTAIN: None. <br />RECUSED: None. <br />ABSENT: Fox. <br /> <br />Resolution No. PC-2008-43 was approved and entered as motioned. <br /> <br />7. MATTERS INITIATED BY COMMISSION MEMBERS <br /> <br />a. Discussion of the types of projects to be placed on the Consent Calendar. <br /> <br />No discussion was held or taken. <br /> <br />Conditions of Approval Reference in Staff Reports <br /> <br />Commissioner Olson noted that the staff report for the Yee project included <br />numerous references to specific Conditions in Exhibit B. He inquired if it would be <br />possible for staff to include in parentheses the number of the specific Condition <br />being referenced. Ms. Decker agreed this could be done. <br />PLANNING COMMISSION MINUTES, August 13, 2008 Page 24 of 26 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.