Laserfiche WebLink
106. <br /> <br />The storm drainage from each lot shall be directed to the street or to an approved storm drain <br />system in accordance with Sections 2907(b)(5) and 7012(d) of the 1988 Uniform Building <br />Code. <br /> <br />107. Unless otherwise approved by the City Engineer, all fill and cut slopes shall be 3:1 horizontal <br /> to vertical or less. <br /> <br />108. <br /> <br />If required, the project developer shall construct transit shelters with trash receptacles at <br />locations determined by the Planning Director and the City Engineer. The shelter and trash <br />receptacle design shall he approved by the Planning Director prior to issuance of project <br />building permits. An encroachment permit shall be obtained prior to installation. Lighting <br />shall be provided if determined necessary by the City Engineer. <br /> <br />109. <br /> <br />All utilities required to serve any existing or proposed development on-site shall be installed <br />underground, unless otherwise determined by the City Engineer, including Mohr Avenue and <br />Busch Road. All utility lines (PG&E, Pac Bell, & cable TV) shall be installed in a conduit. <br /> <br />110. <br /> <br />The project developer shall comply with the recommendations of the following geotechnical <br />reports and their subsequent peer review and response letters: <br />a. "Geotechnical Investigation Report, Proposed Residential Subdivision on the Busch <br /> Property," prepared by Kleinfelder, Inc. and dated April 22, 1996. <br />b. "Phase One Environmental Site Assessment 88 Acres Farmland End of Mohr <br />Avenue," prepared by Certified Engineering and Testing and dated May 28, 1994. <br />c. "Shallow Subsurface Investigation," prepared by Certified Engineering and Testing <br /> and dated August 2, 1994. <br />d. "Subsurface Investigation" prepared by Recon Environmental Corporation and dated <br /> January 9, 1995. <br /> <br />111. <br /> <br />The following geotechnical reports shall be peer reviewed at the developer's expense and <br />those final recommendations submitted for review with the tentative map submittal. The <br />project developer shall comply with the recommendations of the following geotechnical <br />reports and subsequent peer review and response letters. <br />a. "Geotechnical Investigation - Busch Property," prepared by Lowney Associates and <br /> dated June 11, 2002. <br />b. "Phase I Environmental Site Assessment," prepared by Lowney Associates and dated <br /> June 13, 2002. <br />c. "Reconnaissance Level Slope Stability Evaluation of Existing Quarry Slope," <br /> prepared by Lowney Associates and dated June 7, 2002. <br />d. "Corrosivity Analysis," prepared by Cerco Analytical, Inc. and dated January 11, <br /> 2002. <br /> <br />City Council Page 25 of 32 August 20, 2002 <br /> <br /> <br />