Laserfiche WebLink
69. The project developer shall submit a dust control plan or procedure as part of the im- <br /> provement plans. <br /> <br />70. <br /> <br />On-site drainage swales, gutters, and inlets shall be privately maintained by the project <br />developer/property owner. <br /> <br />71. <br /> <br />The project developer shall submit detailed landscape and irrigation plans as part of the <br />improvement plans for the project's Valley Avenue and Bernal Avenue street frontages. <br />The irrigation plan shall provide for automatic controls. <br /> <br />72. <br /> <br />Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the project de- <br />veloper. This shall include slurry seal, overlay, or street reconstruction if deemed war- <br />ranted by the City Engineer. <br /> <br />73. <br /> <br />The project developer's contractor(s) shall obtain an encroachment permit from the City <br />Engineer prior to moving any construction equipment onto the site. <br /> <br />Urban Stormwater Runoff Requirements: <br /> <br />74. <br /> <br />The project's fuel dispensing areas shall be covered with the canopy shown on Exhibit A. <br />Downspouts from the canopy shall be routed to prevent drainage across the fuel dispens- <br />ing area. The fuel dispensing area shall be constructed of concrete and shall extend a <br />minimum distance of 12 feet from the fueling island and at least four-feet from the nose <br />of the dispensing island. The fuel dispensing area shall be designed to drain towards the <br />center of the island-area and then to an underground dry sump. The dry sump shall not <br />be connected to the storm drain or sanitary sewer but shall be pumped out by the property <br />owner/station operator whenever a spill occurs. The size of the dry-sump shall be deter- <br />mined by the City Engineer and Fire Marshall in conjunction with the building permit re- <br />view and shall be shown on the building permit plan set to the satisfaction of the Planning <br />Director, City Engineer, and Fire Marshall before issuance of a building permit. <br /> <br />75. <br /> <br />The service station owner/operator shall dry sweep the fuel dispensing area routinely, and <br />shall inspect or have inspected regularly the dispensing equipment for proper function <br />and leak prevention. The service station owner/operator shall have a spill clean-up plan <br />approved by the Fire Department and in place before issuance of an occupancy permit. <br /> <br />76. <br /> <br />The site area outside of the canopy area shall be designed to drain away from the fuel <br />dispensing area. This detail shall be shown on the building permit plan set to the satisfac- <br />tion of the Planning Director and the City Engineer before issuance ora building permit. <br /> <br />77. <br /> <br />The site's perimeter landscape areas facing Valley Avenue and Bernal Avenue frontages <br />shall be designed, planted, and maintained so as to function as a vegetative filter/bio- <br />swale area for the project. The project developer is directed to the "Start at the Source" <br /> <br />Page 11 of 14 <br /> <br /> <br />