Installation Costs <br /> As mentioned, staff had previously solicited bids for the reinstallation of the Foothill <br /> Road street lights from the City street light maintenance contractor, Vista Universal Inc., <br /> as well as the contractor currently doing street light replacement on another City <br /> contract, Lawrence Backhoe Services. Based upon the two previous bids, it was <br /> determined that Vista Universal was the lowest bidder. Staff has been working with <br /> Vista Universal to keep current with the escalating price of materials and labor for the <br /> installation of these street lights. The price quotation for the 18 new poles with LED <br /> lights is $45,908. Additionally, staff also asked for a price to replace the three existing <br /> HPS street lights with LED lights to give a consistent appearance to the roadway along <br /> the Golden Eagle Frontage, as the light source for LED lighting casts more of a white <br /> light, while HPS lighting casts more of a yellow light. In order to provide for more <br /> uniform lighting along this corridor and in anticipation of the eventual City -wide <br /> conversion to LED lighting, it is recommended that the existing intermediate lighting at <br /> the intersections be converted to LED lighting as well. The price quotation for the three <br /> intersection lights is $2,970. If Council determines that all eighteen street lights and the <br /> three existing street lights on Foothill Road be retrofitted with LED lights, staff <br /> recommends the City Manager be authorized to enter into a contract with Vista <br /> Universal, Inc. for the installation of these street lights. <br /> As mentioned previously, since the street lights were removed in 1990, the trees around <br /> the street light bases have grown considerably; consequently, some of the trees may <br /> require pruning before the poles can be installed. This pruning could incur extra costs <br /> above the bid price mentioned for the street light installation. Staff has not obtained <br /> pricing for this work, but anticipates that the cost will be less than $5,000. The project <br /> contingency has been increased from the normal 10% to 15% to allow sufficient funds <br /> for any necessary tree trimming. <br /> Submitte y: Fiscal Review: Approve by: <br /> Brian Dolan David P. Culver Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Map (overview) of location of homes along Foothill Road and distance between <br /> the homes and the proposed street lights. <br /> 2. Accident pin map and detailed summary of traffic accidents on Foothill Road <br /> (between Bernal Avenue and southern City limits) over the past 7 years <br /> 3. Detail showing LED and HPS light fixture broadcast patterns <br /> Page 5 of 5 <br />