My WebLink
|
Help
|
About
|
Sign Out
RES 09314
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2009
>
RES 09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2009 4:35:47 PM
Creation date
8/19/2009 4:35:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/21/2009
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 09314
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2005 Pleasanton Plan 2025 DRAFT 3.0 Circulation Element <br /> Program 18.3: Encourage a more direct and convenient connection of BART with ACE rail service. <br /> Policy 19: Support the continued and expanded service of the Altamont Commuter Express. <br /> Program 19.1: Continue to work with the San Joaquin Rail Commission to improve Altamont Commuter Express <br /> (ACE) service. <br /> Program 19.2: Seek a permanent location in P1 anton for the A E train station <br /> Program 1921: Support the study of a high -speed rail spur from the Central Valley into Livermore where Fast Bay <br /> travelers can connect with the existing Altamont Commuter Express (ACE) train and an extension of <br /> BART from Pleasanton /Dublin. <br /> Policy 20: Support paratransit services to elderly and disabled residents of Pleasanton. <br /> Program 20.1: Fund capital and operating expenditures for the City's Dial -A -Bus program. <br /> Policy 21: Support the use of alternative fuel vehicles. <br /> Program 21.1: Encourage the construction of infrastructure for and use of alternative fuel vehicles. <br /> Policy 22: Create and maintain a safe, convenient, and effective bicycle system which encourages increased bicycle use. <br /> Program 22.1: Implement the Community Trails Matter Plan. <br /> Program 22.2: Prepare and adopt a citywide pedestrian and bicycle master plan. Identify areas where additional bicycle <br /> parking facilities are needed. <br /> Program 22.3: Integrate bicycle lanes or separate bikeways into street projects, wherever feasible. <br /> Program 22.4 Require design measures and facilities to accommodate access by pedestrians, bicycles, and transit in <br /> new developments, induding bus shelters and turnabouts, bicycle parking facilities, bicycle and <br /> pedestrian trails, and transit friendly designs for the site perimeter and internal circulation patterns. <br /> Program 22.5: Require appropriate bicycle related improvements (i.e., work -place provision for showers, bicycle <br /> storage, bicycle lanes, etc.) with new development. <br /> Program 22.6: Maintain bicycle routes with adequate sweeping and pavement repairs. <br /> 3 c culaion port 11 3 -54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.