Laserfiche WebLink
local representative about the expected time when the grid framework in <br /> which the Work will be installed is to be installed at the site. <br /> 2) When the City's representative advises (by phone, email or facsimile) Glass <br /> Studio Peters' local representative that the building is ready for the field <br /> measurement, Glass Studio Peters' local representative shall come to the <br /> site to carry out such field measurement within seven (7) business days. If <br /> the grid framework in which the Work will be installed is erected on the <br /> building, the General Contractor shall allow Glass Studio Peter's local <br /> representative to use the General Contractor's ladders, scaffolding, or crane <br /> to access the grid framework for taking the field measurement. <br /> B. Fabrication. Glass Studio Peters shall fabricate the Work, as generally <br /> described in Exhibit A, in consultation with the Artist, as based on the size specifications of <br /> the drawings provided by W.A.Thomas' subcontractors, and as confirmed or modified by the <br /> field measurement. The fabrication shall immediately commence after the field measurements <br /> are provided by Glass Studio Peters' local representative. <br /> C. Delivery of the Work. <br /> 1) Glass Studio Peters, or its agents, shall deliver the Work to the Firehouse <br /> Arts Center in Pleasanton, California, within three and one -half months of <br /> the date of the field measurement by Glass Studio Peters' local <br /> representative. <br /> i. This includes the time and costs needed for Glass Studio Peters, or <br /> its agents, to have the Work enter the United States through the <br /> proper U. S. Customs procedures. <br /> 2) Upon the delivery of the Work to the Firehouse Arts Center, the City's <br /> representative shall contact Glass Studio Peters' local representative, who <br /> shall come to the site within three (3) days, and who will supervise the <br /> unpacking of the Work by the General Contractor, and the parties shall <br /> inspect the shipment to determine whether any portions of the Work were <br /> damaged or lost during delivery. <br /> 3) Glass Studio Peters' local representative shall give notice to the General <br /> Contractor's agent, Sam Huckaby of O'Connor Construction Management <br /> at (925) 485 -1341, of the specific date and time when the Work will be <br /> delivered to the site; which notice shall be at least forty -eight (48) hours in <br /> advance of such delivery. <br /> D. Consulting During Installation. Within three (3) business days following the <br /> supervised unpacking of the Work, Glass Studio Peters' local representative shall start to <br /> provide on -site coordination and consultation with the General Contractor, or its <br /> subcontractor, regarding the installation of the Work at the Firehouse Arts Center. Glass <br /> Page 2 of 8 <br />