My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
072109
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 2:34:33 PM
Creation date
7/14/2009 2:34:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/21/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> THE CITY OF <br /> m °s CITY COUNCIL AGENDA REPORT <br /> pL£ASANTONo <br /> July21, 2009 <br /> Community Development <br /> Engineering Division <br /> TITLE: ACCEPT PUBLIC IMPROVEMENTS PERFORMED BY ENV2, INC. FOR <br /> THE MOHR AVENUE SIDEWALK CONSTRUCTION PROJECT, CIP <br /> NO. 015032 <br /> SUMMARY <br /> The Mohr Avenue Sidewalk Construction project has been completed and staff is <br /> recommending final project acceptance. The project was designed to improve <br /> pedestrian access, as well as storm water collection. The work consisted of removing <br /> existing asphalt sidewalk and replacing it with new concrete sidewalk, installing curb <br /> and gutter, two ADA- compliant ramps, and accompanying landscaping. The project is <br /> located on Mohr Avenue between Santa Rita Road and the Alameda County <br /> Transportation Corridor. <br /> RECOMMENDATION <br /> 1. Accept the project improvements and authorize the City Clerk to file a Notice of <br /> Completion. <br /> 2. Authorize payment of remaining contract balance when directed by the California <br /> Department of Industrial Relations, Division of Labor Standards Enforcement. <br /> 3. Authorize the use of $4,657 in available funds from the project budget, CIP No. <br /> 015032, to cover additional construction expenses that exceed the approved <br /> construction budget. <br /> FINANCIAL STATEMENT <br /> This project replaced and upgraded existing infrastructure and will not increase <br /> maintenance costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.