My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
072109
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 2:32:10 PM
Creation date
7/14/2009 2:32:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/21/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 EC E 1 V ED <br /> PA 1 8 2UUJ <br /> BonaTech Engineering <br /> 445 North San Joaquin Street, Stockton, CA 95202 <br /> Phone: 209-601-2979 Fax: 209-644-5782 <br /> June 11, 2009 <br /> City of Pleasanton <br /> 123 Main Street <br /> Pleasanton, CA 94566 <br /> Dear Mr. Lorenzo King <br /> Re: Bid Result for Annual Water Replacement, Project 081028 <br /> BonaTech Engineering is the apparent low bidder for the City of Pleasanton Annual <br /> Water Replacement Project 081028 after the bids were opened yesterday, June 10, 2009. <br /> BonaTech Engineering bid amount was $231, 650.00, while the second lowest bidder <br /> amount was $411, 760.00, with such disparity, we reviewed our take off again, and by <br /> doing so, we discovered that there were mathematical errors made in arriving to the bid <br /> amount we quoted in our bid. With the bid amount as quoted in our bid, it will be <br /> impossible to carry out the project as specified in the project document. <br /> In accordance with California Public Contract Code Section 5103, BonaTech <br /> Engineering hereby states that a mistake was made in preparation of the bid. This letter <br /> serves as a written notice within five days after the bid opening of the mistake. The <br /> mistake was a mathematical error in adding the cost of paving areas to the total of the bid <br /> plus the associated cost involved in the normal restoration of the roadway after the pipes <br /> were placed. The take -off was done by two estimators, and the estimator that puts the <br /> total bids together did not include the cost of asphalt concrete paving to the final bid <br /> amount. The mistake was made in filling out the bid, and not due to error in judgment or <br /> to carelessness in inspecting the site of the work, or in reading the plans or specifications. <br /> As a result of the mistake stated above, we request that you relieve BonaTech <br /> Engineering of the bid. We regret any inconvenience our mistake might have caused your <br /> agency. <br /> Sincerely, <br /> 2 0 V1/1 Cille44)Ch/ 5--ti <br /> Bonaventure Ezeji, P.E. <br /> President, BonaTech Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.