My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
072109
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 2:25:01 PM
Creation date
7/14/2009 2:24:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/21/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. Consider introduction of an ordinance adding Chapter 9.21 to the Pleasanton Municipal Code <br /> regarding construction and demolition debris <br /> Mr. Bocian gave the staff report, stating about two years ago, StopWaste.org indicated that as a <br /> condition for receipt of mitigation funding there were five steps it wanted cities to take; one step was <br /> to implement a C &D ordinance. Staff has worked on the matter over the past year which is based <br /> upon a model ordinance used by StopWaste.org. Staff made some changes and the ordinance <br /> requires that 90% of cement and 50% of all other materials involved in a construction or demolition <br /> project be recycled. The project threshold limits are $125,000 for construction and $25,000 for <br /> demolitions. <br /> He said the ordinance has details about what recyclable and refuse materials are. When an <br /> applicant is involved and exceeds the limits, they are required to prepare a Waste Management <br /> Plan (WMP) which outlines the types of materials on the project, the amount of material recycled, <br /> the amount projected to be landfill, and the projected diversion rate with the understanding that the <br /> WMP will be required to show that the applicant will meet the intent of the ordinance. If it does, the <br /> applicant moves forward to continue in its planning and obtains a building permit. Prior to the <br /> certificate of occupancy or final sign -off on a project, the contractor /applicant is required to provide <br /> information that indicates it met goals outlined in the WMP. <br /> There are three levels of compliance or non compliance that the ordinance sets forth: 1) Full <br /> compliance means the applicant met all requirements set forth in the WMP or more specifically, met <br /> the requirements of the ordinance; 2) A good faith compliance process is a process where the <br /> applicant would demonstrate to the City that it made every attempt to meet what is set forth in the <br /> WMP but for some reason, it was unable to completely do so. An example is a particular product <br /> on -site that could be recycled but there exists no market for; and therefore, it would have to be land <br /> filled. Good faith compliance is determined by the compliance officer, which in most cases is the <br /> City's Chief Building Official; and 3) Non compliance —the applicant does not meet the target or <br /> does not try to comply, at which point the applicant would not be advanced through the permit <br /> process. The applicant would have to return and try to generate records which show what was <br /> recycled or if there was still debris on the project, it would need to be recycled and documented. <br /> There is also a provision for the applicant to have an opportunity to appeal a non compliance <br /> situation to the compliance officer and ultimately to the City Manager. There could also be an <br /> exemption, where an unusual situation exists where for whatever reason the construction project <br /> does not lend itself to recycle material. In this case, the compliance officer could determine the <br /> project as exempt. Hazardous materials are dealt with separately in the ordinance, which is an <br /> example of non recyclable material. <br /> Councilmember Sullivan questioned if the process matched the StopWaste.org ordinance. Mr. <br /> Bocian said it does, except some cities are recommending the applicant/contractor post a bond. In <br /> the event there was non compliance, the City could retain this bond. He said some cities have not <br /> done this and based upon conversations with StopWaste.org, staff decided not to include it <br /> because it is a considerable administrative process and can lead to issues in moving forward. The <br /> general intent of the ordinance is not to be punitive, but for the applicant to go through a process to <br /> identify diversion and demonstrate that the diversion goals were met. <br /> If the City went through the appeals process, chances are that the certificate of occupancy could be <br /> issued but the applicant is faced with considerable time and money moving through a lengthy <br /> appeal process. Staff wants the process to be user friendly, easy to understand, and to have the <br /> applicant try to recycle as much as possible. Even for projects that do not meet the financial <br /> City Council Minutes Page 11 of 13 June 16, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.