Laserfiche WebLink
PART B <br /> AN ESTIMATE OF THE COST OF THE MAINTENANCE <br /> 2009 -2010 <br /> LIGHTING AND LANDSCAPE MAINTENANCE DISTRICT <br /> NO. 1993 -1 WINDSOR <br /> CITY OF PLEASANTON <br /> A. Landscaping (maintenance): <br /> 1. Tapestry Way Area A (60,315 sq. ft.) <br /> 2. Creekside Area B (24,673 sq. ft.) <br /> 3. Entry Creekside Area C (16,307 sq. ft.) <br /> total area 101,295 sq. ft $11,700.00 <br /> B. Water <br /> 1. All Planting $5,500.00 <br /> C. Power <br /> 1. 2 Controllers ($18 per month) $216.00 <br /> D. Reserve /Long -Term Replacement Fund for scheduled long -term <br /> replacement of various district improvements (see note) $5,143.90 <br /> E. City of Pleasanton Administration Fee $1,300.00 <br /> SUBTOTAL $23,859.90 <br /> County Fees for Collection of Assessments $405.90 <br /> GRAND TOTAL $24,265.80 <br /> Assessment per Unit (90 units) $269.62 per year <br /> Note: <br /> An existing surplus of only approximately $7,400 currently exists for Lighting and Landscape <br /> Maintenance District 1993 -1, Windsor, as a significant re- landscaping and irrigation renovation <br /> project was undertaken in 2006. Reserve /replacement funds will be held in an interest bearing <br /> account until needed for future repairs or replacement of entry walls, signage, irrigation systems, <br /> landscaping or other District features. <br /> 4 <br />