Laserfiche WebLink
<br />PARTB <br /> <br />AN ESTIMATE OF THE COST OF THE MAINTENANCE <br />2002-2003 <br />WINDSOR LIGHTING AND LANDSCAPE MAINTENANCE DISTRICT <br />NO. 1993-1 <br />CITY OF PLEASANTON <br /> <br />A. Landscaping (maintenance): <br />I. Tapestry Way Area A (60.315 sq. ft.) <br />2. Creekside Area B (24.673 sq. ft.) <br />3. Entry Creekside Area C (16.307 sq. ft.) <br /> <br />total area 101.295 sq. ft.....................................................$ 9,984.00 <br /> <br />B. Water <br /> <br />I. All Planting ...................................................................$ 9,567.00 <br /> <br />C. Power <br /> <br />1.2 Controllers ($18 per month)........................................$ 216.00 <br /> <br />D. Reserve/Long-Term Replacement Fund for scheduled long-term <br />replacement of various district improvements (see note)...............$2,793.00 <br /> <br />E. City of Pleasant on Administration Fee.................................................$ 1,300.00 <br /> <br />SUBTOTAL <br /> <br />$23,860.00 <br /> <br />County Fees for Collection of Assessments ..................................$ 405.80 <br /> <br />GRAND TOTAL .........................................................................$24,265.80 <br /> <br />Assessmenl per Unit (90 units) ...............................$269.62 per year <br /> <br />Note: <br /> <br />An existing surplus of approximately $18.220.00 exists for Landscape District 1993-1. These funds are held in <br />an interest bearing account until needed for repairs or future replacement of the entry walls, signage, irrigation <br />systems. landscaping or other district features. <br /> <br />G:\My Documents\199J-1 Willdsor\EnginccrsRcportWINDSR02.doc 4 <br /> <br />1,1 II <br />