My WebLink
|
Help
|
About
|
Sign Out
RES 02072
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2002
>
RES 02072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2002 3:35:37 PM
Creation date
8/8/2002 3:11:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/9/2002
DOCUMENT NO
RES 02072
DOCUMENT NAME
BERNAL PROPERTY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOLOGICAL IMPACTS <br /> <br />IMitigation Measure: <br /> <br />Water quality preservation measures during <br />construction. <br /> <br />Impact to be Mitigated: Construction activity would impact water quality. <br /> <br />Agency / Individual <br />Responsible for <br />Implementation: <br /> <br />Implementation Timing: <br /> <br />Mitigation Specifications: <br /> <br />Agency / Individual <br />Responsible for <br />Monitoring: <br /> <br />Action by Monitor: <br /> <br />Monitoring Timing: <br /> <br />City of Pleasanton Public Works Department, <br />Contractor <br /> <br />During construction <br /> <br />(1) Implement erosion and siltation control measures <br />(2) Minimize discharge of fine sediment from work site <br />(3) Locate staging and storage areas outside of stream's <br /> high water channels and associated riparian area; <br /> position equipment over drip-pans; move vehicles to <br /> safe locations prior to re-fueling <br />(4) Prohibit storing building materials where they could be <br /> washed into the water or where they could cover <br /> riparian vegetation <br />(5) Prohibit project-related materials (sawdust, raw cement, <br /> etc.) from contaminating the soil and/or entering the <br /> waters <br />(6) Prohibit contractor from dumping litter or construction <br /> debris within the arroyo / riparian zone <br />(7) Require regular removal of debris and correct disposal <br /> from the project site <br /> <br />City of Pleasanton Public Works Department, CDFG, <br />RWQCB <br /> <br />Ensure that requirements and prohibitions to preserve water <br />quality are implemented by contractor, subcontractors, and <br />all persons who visit the project site during construction <br /> <br />During construction <br /> <br />Page 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.