My WebLink
|
Help
|
About
|
Sign Out
RES 02072
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2002
>
RES 02072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2002 3:35:37 PM
Creation date
8/8/2002 3:11:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/9/2002
DOCUMENT NO
RES 02072
DOCUMENT NAME
BERNAL PROPERTY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOISE <br /> <br /> Mitigation Measure: <br /> <br />Require conformance with standard City construction <br />noise mitigation regulations and procedmes. <br /> <br />Impact to be Mitigated: <br /> <br />Agency / Individual <br />Responsible for <br />Implementation: <br /> <br />Implementation Timing: <br /> <br />Mitigation Specifications: <br /> <br />Agency / Individual <br />Responsible for <br />Monitoring: <br /> <br />Action by Monitor: <br /> <br />Monitoring Timing: <br /> <br />Construction activity would raise noise levels. <br /> <br />City of Pleasanton Public Works Department <br />Contractor <br /> <br />During construction <br /> <br />Adherence to the ~:onstruction noise regulations of Chapter <br />9.04 of the Pleasanton Municipal Code, which include <br />restrictions on the time of day in which noise may be <br />generated, limits the days of the week in which <br />construction noise may be generated, and limits the dBA <br />which may be produced by construction equipment. <br /> <br />City of Pleasanton Public Works Department <br /> <br />(1) Verify that contractor has notified all employees and all <br />subcontractors regarding the noise limitations <br />(2) Conduct random site visits to verify compliance with <br />conditions. The Plarm/ng Department shall act if <br />complaints alleging noncompliance are received from <br />residents, and record each site visit and complaint. <br /> <br />(1) Prior to start of conslruction <br />(2) During construction <br /> <br />Page 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.