My WebLink
|
Help
|
About
|
Sign Out
ORD 1311
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1301 - 1400
>
ORD 1311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2004 10:24:42 AM
Creation date
3/16/1999 5:59:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1311
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 1311 <br /> <br /> EXHIBIT "A" <br /> <br /> CONDITIONS OF APPROVAL OF PUD-83-10-3M/83-12-2M/86-15-1M <br /> <br /> 1. That the approval be for all streets as shown on Exhibit, on <br /> file with the Planning Department, except as modified herein. <br /> <br /> 2. That at the time the streets are dedicated as public streets, <br /> a total of approximately $B0,000 be paid to the City for <br /> maintenance of the streets, the total cost of said fee to be <br /> pro-rated amongst the various property owners who have not <br /> yet developed to be allowed and collected at the time of <br /> final map approval. <br /> <br /> 3. That one side of all the streets shown on Exhibit "A" be <br /> posted to prohibit parking at all times, the specific sides <br /> to be posted to be approved by the Planning Director and City <br /> Engineer, prior to the dedication of the streets to the City. <br /> <br />4. That the owner(s)/developer(s) shall offer for dedication to <br /> the City for street right-of-way purposes the parcels of land <br /> proposed to be public streets, to the satisfaction of the <br /> City Engineer, prior to any further construction. <br /> <br />5. That street name signs shall be installed per City <br /> requirements. <br /> <br />6. That the applicant be responsible for obtaining legally <br /> adequate deeds from all parties having an interest in the <br /> area of streets to be dedicated. <br /> <br />7. That if deeds for all necessary land in the street <br /> right-of-way cannot be obtained, the applicant shall bear all <br /> costs involved in any condemnation action necessary to secure <br /> said right-of-way. <br /> <br />/// <br /> <br /> - 3 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.