Laserfiche WebLink
EXHIBIT "A" <br /> ORDINANCE NO. 1380 <br /> August 16, 1988 <br /> <br /> 1. All conditions of approval of PUD-88-15 shall remain in ef- <br /> fect, as remain relevant. <br /> <br /> 2. The final development plan shall be as contained in the book- <br /> let entitled, "Golden Eagle Farms," denoted as "revised, <br /> received June 28, 1988," consisting of 14 exhibits, except as <br /> modified by these conditions. <br /> <br /> 3. The uses and site regulations shall be those of the R-1-40,b00 <br /> District, except as those regulations have been specifically <br /> superseded by regulations contained in the final development <br /> plan or these conditions. In addition, Class I auxiliary <br /> structures shall meet the setbacks established in Exhibit 7. <br /> <br /> 4. Each lot shall provide at least three (3) parking spaces on- <br /> site (not within a garage); tandem parking is acceptable to <br /> meet this requirement. <br /> <br /> 5. Street light location and design shall be subject to the <br /> approval of the Planning Director prior to approval of a final <br /> map for the site. <br /> <br /> 6. Final design of the proposed Castlewood driving range expan- <br /> sion shall not remove any Heritage trees, unless selective <br /> removal of a few trees approved by the Planning Director is <br /> necessary for the range to function nor significantly alter <br /> the natural terrain by grading; the final design shall be <br /> subject to review and approval by the Planning Director prior <br /> to installation. If subdivided, this parcel shall remain an <br /> unbuildable lot. <br /> <br />7. Final determination of the use of the Bernal Adobe building <br /> and grounds shall be made and approved through the required <br /> City process prior to sale of any lot in the entire 215-unit <br /> PUD project to its ultimate owner (homebuyer). <br /> <br />8. The seven-plus-acre park, one acre access road and four plus <br /> acre.easement shall be approved for acceptance by the Park and <br /> Recreation Commission prior to approval of a tentative map <br /> showing its dedication. The final layout of the park <br /> boundaries shall be subject to the approval of the Director of <br /> Parks and Community Services. Final design of the turnaround <br /> at the park (Court "C") shall be subject to the review and <br /> approval of the City Engineer and shall follow the master plan <br /> for the park layout, if completed prior to the final <br /> map/improvement plan for this portion of the project. If the <br /> project is phased, the park access road (Street A) shall <br /> precede development reached via Street B. <br /> <br /> <br />