Laserfiche WebLink
CAPITAL IMPROVEMENT PROGRAM <br />STREETS PROJECTS <br /> <br />Denker Drive: Curb and Gutter Replacement 103,000 0 67,722 I70.722 <br />Dublin Canyon Road Bridge Replacement (Additional Funding) 350,000 0 0 350.000 <br />Foothill Rd Widening (East Side) Bemal to Foothill PI (Addl Funding) 90.000 0 0 90.000 <br />Mohr Ave Sidewalk Construction: Kolln Str to Abandoned Railroad R 50,000 0 0 50~000 <br />Neighborhood Traffic Calming Devices 50.000 0 I 0 50.000 <br />Pleasanton Ave Reconstruction from Rose Ave to Division Str 275.000 0 0 275.000 <br />Sidewalks and Handicap Ramps Installations 80,000 0 0 80.(100 <br />Stanle.~ Blvd Widening at Valley & Bemal (Additional Funding) 427.750 0 0 427,750 <br />Stoneridge Drive Roadway Landscaping 90,000 0 0 90.000 <br />Tri-Valley Transportation Fees (Reserx e) 374.153 0 (84.4861 289.667 <br />Upgrade Traffic Signal Sr,,c lbr Full Operation During Power Outages 367.000 0 (247.0001 120.000 <br />Street Median Renovations {see also Parks CIP) 0 0 1.094 1.094 <br />Val Vista Park Expansion (see also Parks CIP) 0 0 67.100 67.100 <br />Street Lighting Upgrades 0 0 45.431 45.431 <br />General Trail Improvements (see also Parks CIP) 0 0 29.105 29.105 <br />1580/E] Charro Interchange Stud~ 0 0 94.70(I 94.700 <br />STREET PROJECT IOTAL $5.317.943 $20.910.791 $347.616 $26.576.350 <br />ENDING STREET FI'ND BALAN(TE $1.480.126 5330.699 (5126.320 $1.684.505 <br /> <br />Streets FY02 Ql.xls 2/26/02 <br /> <br /> <br />