Laserfiche WebLink
Resolution No. PC-01-49 <br />Page 10 <br /> <br />The fire alarm system, including waterflow and valve tamper, shall have plans <br />and specifications submitted to Fire Prevention for review and approval prior to <br />installation. All required inspections and witnessing of tests shall be completed <br />prior to final inspection and occupancy of the building(s). The fire alarm system <br />shall be monitored in accordance with the Pleasanton Municipal Ordinance <br />#1778. The fire alarm system shall transmit zone information to a UL listed <br />Central Station as specified in the Ordinance. <br /> <br />59. <br /> <br />As required by the Fire Chief, all sprinkler and back flow prevention Fire <br />Department connections (FDC) shall be placarded with the address(es) it serves. <br />The placard shall be submitted with the signage package for the site and shall <br />have numerals on a comrasting background. All placards are subject to the <br />review of the Fire Chief. <br /> <br />Police <br /> <br />60. <br /> <br />If required by the Police Department, the building covered by this approval shall <br />be equipped with an alarm system, the type to be approved by the Police <br />Department and that this system shall be installed prior to occupancy of the <br />building. <br /> <br />Engineering <br /> <br />61. <br /> <br />The project developer shall submit a final grading and drainage plan prepared by <br />a licensed civil engineer depicting all final grades and on-site drainage control <br />measures, including concrete-lined V-ditches, to protect all cut and fill slopes <br />from surface water overflow. This plan shall be subject to the review and <br />approval of the City Engineer and/or the Chief Building Official prior to the <br />issuance of any building permits. <br /> <br />62. <br /> <br />The project developer shall submit a refundable cash bond for hazard and erosion <br />control prior to issuance of an Engineering or Building Department permit. The <br />amount of this bond will be determined by the City Engineer. <br /> <br />63. <br /> <br />The project developer shall install structural controls such as oil/water separators <br />(vault-type), fossil filters, Stormceptor system or approved equal in the parking <br />lot to intercept and pretreat storm water prior to reaching the storm drain. The <br />design, locations, and a schedule for maintaining the separator shall be submitted <br />to the City Engineer for review and approval prior to issuance of building permits. <br />The structural control shall be cleaned at least twice a year; once immediately <br />prior to October 15 and once in January. The project developer shall enter into a <br />maintenance agreement for the oil/water separator with the City. <br /> <br />64. <br /> <br />The haul route for all materials to and from this development shall be approved by <br />the City Engineer prior to the issuance of an encroachment permit. <br /> <br /> <br />