Laserfiche WebLink
Resolution No. PC-01-46 <br />Page 12 <br /> <br />October 15 and April 15 unless approved erosion control measures are in place, <br />subject to the approval of the Building Department. Such measures shall be <br />maintained until such time as permanent landscaping is in place. <br /> <br />66. The developer shall submit a dust control plan or procedure as part of the <br /> improvement plans. <br /> <br />67. The design of the water supply and sanitary sewer systems shall be subject to the <br /> review and approval of the City Engineer. <br /> <br />68. <br /> <br />Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of <br />a dedicated public street or public service easement approved by the City Engineer <br />shall be privately maintained by the property owners or through an association <br />approved by the City. <br /> <br />69. <br /> <br />Approval of the storm drainage system shall be subject to the review and approval <br />of the City Engineer and Zone 7, as applicable, that the system is adequate, <br />connects to an approved point of discharge, meets any and all applicable <br />requirements of the Alameda County Flood Control District - Zone 7, meets any <br />and all applicable requirements of the Federal Emergency Management Flood <br />Hazard Program, the California Department offish and Game, and meets the <br />immediate and long-range requirements of this development and all upstream areas <br />intended to be drained through this development. <br /> <br />70. <br /> <br />Any damage to existing street improvements during construction on the subject <br />property shall be repaired to the satisfaction of the City Engineer at full expense to <br />the developer. This shall include slurry seal, overlay. Or street reconstruction if <br />deemed warranted by the City Engineer. <br /> <br />71. <br /> <br />Electric power distribution, gas distribution, communication service, Cable <br />television, and any required alarm systems shall be installed underground in a joint <br />utility trench unless otherwise specifically approved by the City Engineer or <br />Director of Building Inspection for on-site. <br /> <br />72. The project developer's contractor(s) shall obtain an encroachmem permit from the <br /> City Engineer prior to moving any construction equipment onto the site. <br /> <br />73. The project developer shall comply with the City's non-point storm drain <br /> ordinance. <br /> <br />74. <br /> <br />Prior to commencement of any clearing, grading, or excavation, the project <br />developer shall submit to the Planning Department a copy of the State Water <br />Resources Control Board Notice of Intent (NOI) for coverage under the State <br />Construction Storm Water General Permit. <br /> <br /> <br />