Laserfiche WebLink
Resolution No. PC-01-35 <br />Page 11 <br /> <br />Gather all construction debris on a regular basis and place it in a dumpster <br />or other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution. <br /> <br />Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access <br />routes onto the site and place gravel on them. Do not drive vehicles and <br />equipment off paved or graveled areas during wet weather. Broom sweep <br />the street pavement adjoining the project site on a daily basis. Scrape <br />caked-on mud and dirt from these areas before sweeping. <br /> <br />Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any <br />debris or dirt flowing in the storm drain system. Maintain and/or replace <br />filter materials to ensure effectiveness and to prevent street flooding. <br /> <br />Create a contained and covered area on the site for the storage of bags, <br />cement, paints, oils, fertilizers, pesticides, or other materials used on the site <br />that have the potential of being discharged into the storm drain system <br />through being windblown or in the event of a material spill. <br /> <br />e. Never clean machinery, equipment, tools, brushes, or rinse containers into a <br /> street, gutter, or storm drain. <br /> <br />Ensure that concrete/gunite supply trucks or concrete/plaster operations do <br />not discharge wash water into street, gutters, or storm drains. <br /> <br />59. <br /> <br />The project developer shall explore the possibility of adding photovoltaic panels <br />on the building expansion to provide energy for the existing building. If <br />implemented, the details for this installation shall be shown on the building permit <br />plan set for review and approval by the Planning Director before issuance of the <br />building permit. <br /> <br />60. Staff shall notify the Hart Middle School principal regarding this project approval. <br /> <br />61. <br /> <br />The project developer is encouraged to meet with the Civic Arts Commission to <br />provide public art with this phase of construction. <br /> <br />62. <br /> <br />The project developer shall explore the installation of waterless urinals in the <br />expansion. If used, this detail shall be shown on the building permit plan set for <br />review and approval by the Planning Director before issuance of the building <br />permit. <br /> <br />{end} <br /> <br /> <br />