My WebLink
|
Help
|
About
|
Sign Out
PC 2001-22
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2001
>
PC 2001-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:41 AM
Creation date
3/8/2002 9:56:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/11/2001
DOCUMENT NO
PC 2001-22
DOCUMENT NAME
PUD-05
NOTES
CENTEX HOMES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
22. <br /> <br />23. <br /> <br />24. <br /> <br />feasible, the costs and benefits of each component. This report shall be <br />prepared following construction of seventy-five percent (75%) of the <br />project units, with actual energy use data from occupied units, if possible, <br />which shall be forwarded to the Planning Commission for its review. <br /> <br />The project developer shall provide to the buyers of the houses <br />covered by this approval, photovoltaic systems as an option. With <br />the building permit plan set, the project developer shall show the <br />installations for each of the buildings covered by this approval, to <br />the satisfaction of the Planning Director, before issuance of a <br />building permit. <br /> <br />The project developer shall implement the following measures with <br />the construction of the structures covered by this approval so that the <br />owners can install roof-mounted photovoltaic systems in the future: <br /> <br />Electrical conduit and cable shall be installed from the <br />roof/attic areas to the buildings' main electrical panels. <br />Roof trusses shall be "engineered" to handle an additional <br />load of five pounds (5 lbs.) per sq. ft. beyond that anticipated <br />for roofing. <br />An area shall be provided near the electrical panel for the <br />"inverter" required to convert the direct current output from <br />the photovoltaic panels to alternating current. <br />A bi-directional electrical meter shall be installed. <br />The roof shall be designed with built-in attachment points <br />and/or other methods, as determined by the Planning <br />Director, to best allow a simple retrofit of solar panels after <br />the initial construction. <br /> <br />These measures shall be shown on the building permit plan set <br />submitted to the Planning Director for review and approval before <br />issuance of the first building permit. The project developer shall <br />provide to the future homebuyers the necessary information <br />delineating the means by which photovoltaic panels can be applied <br />to the roofs of the structures covered by this approval. This <br />information shall be submitted to the Director of Planning for review <br />and approval prior to occupancy of the first unit. <br /> <br />The project developer shall work with the Planning staff and with <br />representatives of the Sacramento Municipal Utility District to <br />develop a program for the bulk purchase of photovoltaic <br />panels/equipment for this project. This information shall be brought <br /> <br />Conditions of Approval, PUD-5, Centex Homes' Apperson Ridge May 9, 2001 <br /> Page 14 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.