Laserfiche WebLink
Resolution No. PC-01-02 <br />Page 16 <br /> <br />92. <br /> <br />93. <br /> <br />94. <br /> <br />b.) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement, and storm drains adjoining the project site. During wet weather avoid <br />driving vehicles off paved areas. <br /> <br />c.) Broom sweep the public street pavement adjoining the project site on a daily <br />basis. Caked-on mud or dirt shall be scraped from these areas before sweeping. <br /> <br />d.) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br />inlet nearest the downstream side of the project site in order to retain any debris or <br />dirt flowing into the City storm drain system. Filter materials shall be maintained <br />and/or replaced as necessary to ensure effectiveness and to prevent street <br />flooding. Dispose of filter particles in the trash. <br /> <br />e.) Create a contained and covered area on the site for the storage of bags, <br />cement, paints, flammable, oils, fertilizers, pesticides, or any other materials used <br />on the project site that have the potential for being discharged to the storm drain <br />system through being windblown or in the event of a material spill. <br /> <br />f.) Never clean machinery, tools, brushes, etc., or rinse containers into a street, <br />gutter, or storm drain. <br /> <br />g.) Ensure that concrete/gunite supply trucks or concrete/plasterers operations do <br />not discharge wash water into street gutters or drains. <br /> <br />h.) Construction access routes shall be limited to those approved by the City <br />Engineer or Building Inspector and shall be shown on the approved grading plan. <br /> <br />The applicants shall prepare a plan for the installation of photovoltaic panels on <br />the roof of the building, which shall be submitted for review and approval by the <br />City Council in conjunction with its review of the proposed office building <br />project. <br /> <br />The applicants shall install a designated outdoor smoking area with seating for the <br />office building. The applicants shall locate the smoking area an adequate distance <br />from entry doors to insure that smoke does not enter the building. Furthermore, <br />the applicants shall attempt to locate the smoking area away from the surrounding <br />residences. The final design of the smoking area shall be shown on the plans <br />submitted for issuance of building permits and shall be subject to the review and <br />approval by the Planning Director prior to issuance of building permits for the <br />project. <br /> <br />The applicants shall work with the developers of the Kaiser Aluminum and <br />Chemical Corporation property at 6177 Sunol Boulevard to participate in a <br />transportation systems management plan to reduce vehicular traffic. <br /> <br />[end] <br /> <br /> <br />