Laserfiche WebLink
7. The Bernal Adobe shall be made available at reasonable times <br /> and numbers of occasions during each year for school tours <br /> and historic event open house occasions. In the event of a <br /> disagreement over the number of times per year the adobe <br /> shall be made so available, the Planning Commission shall <br /> establish the number of times. <br /> <br /> S. Foothill Road shall be widened sufficiently to create a <br /> deceleration lane at each driveway entrance, the final design <br /> to be approved by the City Engineer prior to construction of <br /> the parking lot. <br /> <br /> 9. The project shall pay its fair share of the signalization of <br /> Bernal Avenue and Foothill Road, the share to be based on an <br /> estimate of the project's peak hour traffic using this <br /> intersection as determined by the City Engineer. <br /> <br />10. The final parking lot layout may be modified, as approved by <br /> the Planning Director, to maximize parking spaces within the <br /> designated guest parking area; modification may include <br /> narrowing parking stalls and/or relocating the southerly <br /> property line; the final parking lot layout shall include <br /> handicapped parking spaces as required by Code. <br /> <br />11. The final landscape plan may modify the proposed landscape <br /> scheme within the courtyard as necessary to meet operational <br /> requirements, said final landscape plan to be reviewed and <br /> approved by the Planning Director prior to issuance of a <br /> building permit. <br /> <br />12. The final design of the parking area (drainage, curb type, <br /> etc.) shall be subject to review and approval by the Planning <br /> Director and City Engineer; the final plan shall be designed <br /> to retain a rural character consistent with the overall site <br /> master plan while achieving satisfactory storm drainage and <br /> other engineering goals. <br /> <br />13. Except as modified by these conditions, all conditions of <br /> approval of case PUD-85-15 and PUD-85-15-2D shall remain in <br /> full force and effect. <br /> <br />14. That the lighting plan for the project shall be subject to <br /> the Planning Director for review and approval prior to <br /> issuing a building permit. <br /> <br />15. This project shall be subject to all Standard Conditions of <br /> Approval, incorporated heroin, except for conditions 8, 12, <br /> 13, 14, 28, 29, 33, 34, 35, 36, 49, and 50. <br /> <br /> -9- <br /> <br />BWS/ems/pd85151m. sr <br /> <br /> <br />