My WebLink
|
Help
|
About
|
Sign Out
2319
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2009 12:10:01 PM
Creation date
6/8/2009 3:27:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/22/1983
DOCUMENT NO
2319
DOCUMENT NAME
MS-82-4
NOTES
WILLIAM YEE
NOTES 2
SUBDIVIDE INTO 4 PARCELS
NOTES 3
WEST FOOTHILL ACROSS FROM FHS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
15. That approval of the water supply and distri- <br />bution system be withheld pending final design <br />and until the developer has demonstrated to the <br />satisfaction of the City Engineer that the proposed <br />system meets both the immediate and long -range <br />requirements for supplying water in this area. <br />16. That the developer comply with any and all <br />applicable requirements of the cross connections <br />control and backflow prevention device programs <br />required by the California Administrative Code, <br />Title 17. <br />17. That a separate water meter be provided to each <br />lot of record within the development unless <br />otherwise approved by the City Engineer. <br />18. That approval for the number, type and location <br />of fire hydrants be withheld pending final design <br />review by the Fire Marshal, and final review by <br />the City Engineer. <br />19. A septic tank will be allowed for one residence on Parcel <br />No. 1, provided City Council approval is obtained. The <br />existing residence on Parcel No. 3 may continue to utilize <br />its septic tank until sanitary sewer service is provided. <br />Prior to the issuance of any building permit for a <br />residence on either Parcel No. 2 or 4, sanitary sewer <br />service satisfactory to the City Engineer shall be provided <br />to Parcels 2, 3, and 4. <br />20. That if a sanitary sewer lift station is installed <br />for use by the development and if it is accepted by <br />the City for maintenance and operation, an agreement <br />shall be completed between the City and the developer <br />prior to the approval of the final map to the effect <br />that the developer will provide a maintenance and <br />operation fund for a minimum ten year period. <br />21. That approval of the storm drainage system be withheld <br />pending final design and until the developer has demonstrated <br />to the satisfaction of the City Engineer that the system is <br />adequate, connects to an approved point of discharge, meets <br />any and all applicable requirements of the Alameda County <br />Flood Control District Zone 7, meets any and all applicable <br />requirements of the Federal Emergency Management Flood Hazard <br />Program, and meets the immediate and long -range requirements <br />of this development and all upstream areas intended to be <br />drained through this tract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.