My WebLink
|
Help
|
About
|
Sign Out
2317
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2009 12:09:54 PM
Creation date
6/8/2009 3:22:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/8/1983
DOCUMENT NO
2317
DOCUMENT NAME
TRACT MAP 5079
NOTES
MILDRED VALLERINO & MIKE HARRIS
NOTES 2
SUBDIVIDE TO 62 LOT TOWNHOUSES
NOTES 3
VINEYARD & AMADOR CT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. That the minimum grade for gutter flowlines in <br />public streets be set at 0.5% unless otherwise <br />approved by the City Engineer. Grades less than <br />0.5% down to 0.3% shall require special approval, <br />submittal of as -built grade sheets, and controlled <br />flow testing. <br />8. That all existing wells, septic tanks or holding <br />tanks on the site be properly sealed, filled and <br />abandoned prior to the start of grading operations <br />unless Zone 7 retains specific wells for observation <br />wells, or special approval is obtained from the City <br />Engineer for temporary use of an existing well for <br />construction water. <br />9. That the haul route for all materials to and from <br />this development be approved by the City Engineer <br />prior to approval of the final map or the start of <br />any construction. <br />10. That the developer submit an erosion and sedimentation <br />control plan or procedure as part of the improvement <br />plans prior to the approval of the final map. <br />11. That the developer submit a dust control plan or <br />procedure as part of the improvement plans prior to <br />approval of the final map. <br />12. That storm drainage swales, gutters, inlets, outfalls <br />and channels not within the area of a dedicated public <br />street or public service easement be privately <br />maintained by the property owners or through an <br />association approved by the City. <br />13. That approval of the water supply and distri- <br />bution system be withheld pending final design <br />and until the developer has demonstrated to the <br />satisfaction of the City Engineer that the proposed <br />system meets both the immediate and long -range <br />requirements for supplying water in this area. <br />14. That the developer comply with any and all <br />applicable requirements of the cross connections <br />control and backflow prevention device programs <br />required by the California Administrative Code, <br />Title 17. <br />15. That the developer pay the applicable Zone 7 and <br />City connection fees and the meter cost prior to <br />Council approval of the development for any water <br />meters (irrigation meters) not directly related <br />to a building permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.