Laserfiche WebLink
APPENDIX A <br /> FY 08 -09 CAPITAL IMPROVEMENT PROGRAM <br /> WATER PROJECTS <br /> Midyear Amendments <br /> Expansion Replacement <br /> CIP tt Fund Fund Total <br /> 355,497 345 <br /> BEGINNING BALANCE <br /> ESTIMATED REVENUES <br /> Water Connection Fees (65,940) (65,940) <br /> TOTAL FEE REVENUE ($65,940) $0 ($65,940) <br /> TRANSFER TO NEXT YEAR'S REVENUE 65,940 65,940 <br /> INTEREST INCOME (Including Project Reserves) 20,000 100,000 120,000 <br /> TOTAL ESTIMATED REVENUES $20,000 $100,000 $120,000 <br /> TRANSFERS FROM: <br /> Water M &O Fund Replacement Accrual 0 <br /> Water M &O Fund Debt Payments 2004 Water Revenue Bonds 0 <br /> Water M &O Fund Polybutylene Repairs 0 <br /> TRANSFERS TO: <br /> Water Debt Service Fund 2004 Bonds 0 <br /> NET TRANSFERS IN /(OUT) $0 $0 $0 <br /> TOTAL FUNDS AVAILABLE $20,000 $100,000 $120,000 <br /> Expenditures: <br /> 011012 Pimlico Dr 'I'umout Water Transmission Line (Reserve) 0 <br /> 011017 New Standby Power Generator: Water Portion (90,000) (90,000) <br /> 011022 Chlorine Injection Sites (24,112) (24,112) <br /> 011023, Vineyard Corridor Infrastructure Imp Phase 111- Water Tank, Supply Lines, Pump <br /> 011024 Station 86,670 86,670 <br /> 031010 Electrical Panel Upgrades and Restorations (44,072) (44,072) <br /> 031015 Pressure Reducing Valve Improvements for Hillside Areas 0 <br /> 051015 SCADA Computer hardware and Software Upgrade (51,493) (51,493) <br /> 051023 McCloud Water Tank Replacement (Refurbishment) (66,871) (66,871) <br /> 061000 Annual Water Quality Improvement Project (125,455) (125,455) <br /> 061006 Golden Eagle Farms New Water Storage Tank (247,000) (403,000) (650,000) <br /> 061008 Annual Automated Meter Reading Retrofit 250,000 250,000 <br /> 061010 Electrical Panel Upgrades and Restorations (38,918) (38,918) <br /> 061011 Annual Control Valve Installation (250,320) (250,320) <br /> 061013 Annual Replacement of Polybutylene Service Laterals Irrigation Lines 0 <br /> 071022 Bi- Annual Emergency Water Generator Overhaul 0 <br /> 071023 Water Tank Corrosion Repairs 0 <br /> 071028 Annual Water Replacement Projects (214,711) (214,711) <br /> 071040 Annual Replacement of Water Meters (44,883) (44,883) <br /> 071041 Water Sewer Asset Management Plan Upgrade 0 <br /> 081000 Bi- Annual Water Quality Improvement Project 125,455 125,455 <br /> 081008 Bi- Annual Automated Meter Reading Retrofit (250,000) (250,000) <br /> 081010 B1- Annual Electrical Panel Upgrades and Restorations 82,990 82,990 <br /> 081011 Bi- Annual Control Valve Installation (20,000) (20,000) <br /> 081013 Bi- Annual Replacement of Polybutylene Service laterals Irrigation Lines 0 <br /> 081028 Annual Water Replacement Projects (2,569) (2,569) <br /> 081033 Black Ave Utilities (Balance of project in Sewer CIP and Streets CIP) 2/7,280 217,280 <br /> 081040 Annual Replacement of Water Meters 44,883 44,883 <br /> 802011 Committee Valley Water Retailers 0 <br /> 941015 Del Valle Parkway Water Main Extension 0 <br /> 971013 Water Connection Fee Update 0 <br /> 971014 Water System Master Plan Update (7,456) (2,485) (9,941) <br /> 991033 Generator Study (Water Portion) (9,308) (9,308) <br /> 999999 General Fund Utility Cut Patching (moved from transfers above) 49,674 49,674 <br /> 999999 General Fund CIP Engineering (moved from transfers above) 48,111 (47,942) 169 <br /> TOTAL WATER PROJECTS ($206,345) ($829,187) ($1,035,532) <br /> ENDING WATER FUND BALANCE $226,345 $929,187 $1,155,532 <br /> note: numbers in italics signify projects already approved by Council A8 <br />