Laserfiche WebLink
APPENDIX A <br /> FY 08 -09 CAPITAL IMPROVEMENT PROGRAM <br /> STREETS PROJECTS <br /> Recommended Midyear Amendments <br /> Streets Traffic Traffic Grants Dev Assess <br /> CIP tt GF CIP Gas Tax Measure B Dev Fee Fee Bernal 558, 561 Contrib Districts Total <br /> 160 550 552,568 535,575 161,166 168 563 499 165, 625,629 <br /> EXPENDITURES: <br /> 005006 Stoneridge Drive Widening at Stoneridge Mall Road 50 <br /> oosoos Dublin Canyon Road (Eastbound) Widening at Foothill Road 50 <br /> 955011 Foothill Road Widening at Dublin Canyon Road $0 <br /> 005017 I -580 Corridor Management/Signals, Phase l (33,965) ($33,965) <br /> 005024 Hopyard Road and Owens Drive Widening Phase II (NPID 41) $0 <br /> 005030 Del Valle Parkway: Ext from First Str to California Ave (Addl Funding) 50 <br /> 005068 Bernal /1-680 Interchange $0 <br /> 015032 Mohr Ave Sidewalk Construction: Kolln Str to Abandoned Railroad ROW $0 <br /> 015041 Tri- Valley Transportation Development Fee Reserve (21,854) (521,854) <br /> 025015 Sunol Blvd at 1 -680 South Bound Off Ramp: Install New Traffic Signal (35,699) ($35,699) <br /> 025023 Dougherty Valley Mitigation Revenue Reserve (31,550) ($31,550) <br /> 035006 Happy Valley Bypass Road 50 <br /> Hacienda Drive Owens Drive: Reconfigure Intersection and Upgrade <br /> 035020 Traffic Signal (76,000) ($76,000) <br /> 045018 Bernal- Meadowlark Drive Street Improvements $0 <br /> 055006 Signal Bernal g Fire Station 4 (597) ($597) <br /> 055021 Evaluation and Reclassification of Street Surfaces (35,438) ($35,438) <br /> 055022 Old Stanley Blvd. Improvements: Main Street to First Street $0 <br /> 055026 Second Bridge over Arroyo de la Laguna at Bernal $0 <br /> 065012 Annual Sidewalk Maintenance (200,000) ($200,000) <br /> 065055 Neighborhood Traffic Calming Devices 50 <br /> 075003 Annual Resurfacing of Various Streets (86,566) (789,003) (4,160) ($879,729) <br /> 075004 Annual Slurry Sealing of Various Streets $0 <br /> 075005 Annual Sidewalk and Intersection Ramp Installations $0 <br /> 075007 Annual Traffic Buttons and Line Markers Installation (49,242) ($49,242) <br /> 075009 Annual Curb and Gutter Replacements for Street Resurfacing Projects (29,719) ($29,719) <br /> 075012 Annual Sidewalk Maintenance (15,859) ($15,859) <br /> 075014 Traffic Signal Vineyard Pietronave Lane 50 <br /> 075021 Evaluation and Reclassification of Street Surfaces 35,439 $35,439 <br /> 075032 Upgrade Traffic Signal Master Software $0 <br /> Santa Rita Road Francisco Street Traffic Signal Design Potential <br /> 075035 Installation (169,530) ($169,530) <br /> 075039 Bi- Annual Flashing Beacons In- Pavement Flashers 50 <br /> 081033 Black Ave Utilities (Balance of project is in Water CIP and Sewer CIP) 125,360 $125,360 <br /> 085003 Annual Resurfacing of Various Streets (246,322) 387,377 4,161 58,432 $203,648 <br /> 085004 fpteAntlln �h Sea1,n of.Va[Lnus Stree 50 <br /> D nir1 no11c�J algn.rr omencimcnta/6anafcro already approved by .......H <br /> A2 <br />