Laserfiche WebLink
TOTAL CONSTRUCTION COSTS UNIT NO. 4 <br /> <br /> "P ' UNIT NO. 4 <br />INCIDENTAL EA. ENSES~ <br /> <br /> City planning & checking <br />2. Sewer connection fee <br />3. Annexation fee <br />4. Water fee <br />5. 3/4" waner meter fee <br /> <br />7. 2" water meter fee <br /> City sC~inistrative overhead <br />9. £n~inearing fees <br />i0. Soils engineering fees <br />11. Legal fees <br /> 12. PG&E Gas Main deposit <br /> 13. Street trees, 80 ~ 15.00 <br /> <br />TOTAL PROJECT COST UNIT NO. 4 <br /> <br />TOTAL PROJECT COSTS: <br />I. Unit No. 2 <br /> <br />II. Unit No. 3 <br /> <br />III. Unit No. 4 <br /> <br />TOTAL PROJECT (2, 3 & 4) COSTS: <br /> <br />ACqUISItION COSTS <br />1. Acquisitiou of capacity in improvements <br /> being installed in Tracc No. 2473 <br />2. Legal fees in connection wi~h acquisitions <br />3. Engineering fee~ ia connection wi~h acquisitions <br /> <br />COS~ OF PROCEEDINGS <br /> <br />1. Auaitor <br />2. Bong Transportation <br />' 3. Bank Check Writing <br /> <br />TOTAL COST OF ACQUISITION AND CONSTRUCTION OF IbtPROVEMENTS <br />IN A$bESSMENT DISTRICT NOo 6~-1, CI~Y OF PLEASANTON <br /> <br /> -7 <br /> <br />$141,468.40 <br /> <br />4,920.09 <br />1,297.65 <br />1,287.65 <br />2,034.49 <br />1,137.50 <br />3~0.00 <br />2,730.00 <br />730.87 <br />13,789.31 <br />3,300.00 <br />4,385.23 <br />5,414.00 <br />1~200.00 .42,5~6.79 <br /> <br />$184,035.19 <br /> <br />150,664.04 <br />21~,642~16 <br />184,035.19 <br /> <br />$551,341.39 <br /> <br /> 20,288.38 <br /> 5gl.40 <br />. ..~,474.89 <br /> <br />.23~344.67 <br /> <br />180~00 <br />08.96 <br />32.92 251.88 <br /> <br />$574,937 ~94 <br /> <br /> <br />